Novel worktable and flexible production line body
A flexible production line and workbench technology, applied in metal processing, manufacturing tools, metal processing equipment, etc., can solve the problems of insufficient flexibility of the production line, achieve high flexibility, ensure production progress, and save costs
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0050] like figure 1 As shown, a flexible production line body includes several workbenches 1, and the workbenches 1 are spliced through their connecting devices 110 to form 3 production lines in m-shaped design, and the 3 production lines include two branch lines 2 and a The main line 3 and the completed process products of the branch line 2 are respectively transferred to the main line 3, and the main line 3 continues to complete the operation.
[0051] Wherein, the transmission between the two branch lines and the main line is realized through the transmission belt 4, and the transmission belt 4 includes two groups, respectively connecting the process at the end of the two branch lines 2 and the process at the head of the main line 3, so that the finished process products of the branch line 2 pass through The transmission belt 4 is passed to the main line 3 to continue to complete, and the transmission directions of the two groups of transmission belts 4 are opposite.
...
Embodiment 2
[0076] like Image 6 As shown, the difference between this embodiment and Embodiment 1 is that the production line body composed of the workbench in this embodiment also includes two sub-main lines 5, wherein the tails of the two branch lines 2 are respectively connected to the two sub-main lines through transmission belts. 5, and the tails of the two sub-main lines 5 are respectively connected to the head of the main line 3 through transmission belts; the process products completed by the branch line 2 are transmitted to the sub-main line 5, and the sub-main line 5 continues to complete, while the completed process products of the sub-main line 5 go to the sub-main line 5. Mainline 3 transmission, completed by mainline 3.