Excavator stretching and contracting arm and excavator
An excavator and telescopic boom technology, applied in the field of construction machinery, can solve problems such as shortening the service life of the telescopic boom, and achieve the effects of prolonging the service life, reducing the amount of impurities and reducing wear and tear
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0034] Such as figure 1 As shown, the telescopic arm of the excavator provided in this embodiment includes a stick 1, a bucket and an airtight cover 4. One end of the stick 1 and the bucket are connected in rotation through a bushing 10, a rotating shaft 3 and an ear plate 2. The rotating shaft 3 is sleeved in the shaft sleeve 10 and installed on the ear plate 2. The airtight cover 4 is installed on the side of the end of the ear plate 2 near the rotating shaft 3, and an airtight space can be formed between the airtight cover 4 and the ear plate 2 to close the gap between the end of the rotating shaft 3 and the ear plate 2 .
[0035] When the telescopic arm of the excavator is working underwater, such as dredging underwater and dredging sand underwater, the telescopic arm of the excavator will stir up impurities such as water and sediment. flow in all directions. Since the telescopic arm of the excavator provided in this embodiment is provided with an airtight cover 4, the ...
Embodiment 2
[0075] The excavator provided in this embodiment is provided with the telescopic arm of the excavator in Embodiment 1, so the excavator provided in this embodiment can solve the same technical problems as the telescopic arm of the excavator in Embodiment 1 and achieve the same beneficial effect .
[0076] The excavator provided by this embodiment also alleviates the problem that in the prior art, when the telescopic arm of the excavator of the excavator is operating underwater, impurities are likely to follow the water flow along the axis of the pin shaft between the bucket and the arm 1. After passing through the gap between the bucket ear plate 2 and the pin shaft, continue to pass through the dust ring and enter between the shaft sleeve 10 on the arm 1 and the pin shaft, resulting in that the gap between the pin shaft and the shaft sleeve 10 is still It will be subject to greater wear and tear and reduce the technical problem of the service life of the telescopic arm of the...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 