Problems solved by technology

Due to the high technical requirements for steel used in offshore platforms, especially for steel used in key parts, it is difficult for the existing steel plates and their production methods to meet the technical requirements

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Steel plate for high-strength offshore wind power installation platform and production method thereof
  • Steel plate for high-strength offshore wind power installation platform and production method thereof
  • Steel plate for high-strength offshore wind power installation platform and production method thereof

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0028] The production method of the steel plate for the high-strength offshore wind power installation platform in this embodiment includes the steps of heating, rolling, annealing, and heat treatment. The specific steps of each process are as follows:

[0029] 1) Heating process: billet charging temperature is 352°C, stew steel for 3 hours, then raise the temperature to 1200°C at 80°C / h, the maximum heating temperature is 1240°C, soaking temperature is 1200-1220°C, and the soaking section holding time is 26 hours;

[0030] 2) Rolling process: II-stage rolling process is adopted, in which the second-stage rolling temperature is 860°C, the final rolling temperature is 800°C, the watering temperature of the rolled steel plate is 700°C, and the steel plate is annealed immediately after rolling;

[0031] 3) Annealing process: the temperature of the steel plate entering the furnace is 310°C, the annealing temperature is 850°C, and the holding time is 1.58min / mm. After the holding t...

Embodiment 2

[0035] The production method of the steel plate for the high-strength offshore wind power installation platform in this embodiment includes the steps of heating, rolling, annealing, and heat treatment. The specific steps of each process are as follows:

[0036] 1) Heating process: billet furnace temperature is 372°C, steel is stewed for 3 hours, then the temperature is raised to 1200°C at a rate of 90°C / h, the maximum heating temperature is 1240°C, the soaking temperature is 1200-1220°C, and the soaking section holding time is 24 hours;

[0037] 2) Rolling process: II-stage rolling process is adopted, in which the second-stage rolling temperature is 852°C, the final rolling temperature is 800°C, the watering temperature of the rolled steel plate is 680°C, and the steel plate is annealed immediately after rolling;

[0038] 3) Annealing process: the temperature of the steel plate entering the furnace is 340°C, the annealing temperature is 850°C, and the holding time is 1.7min / mm...

Embodiment 3

[0042] The production method of the steel plate for the high-strength offshore wind power installation platform in this embodiment includes the steps of heating, rolling, annealing, and heat treatment. The specific steps of each process are as follows:

[0043] 1) Heating process: billet furnace temperature is 392°C, steel is stewed for 3.5 hours, then the temperature is raised to 1200°C at 80°C / h, the maximum heating temperature is 1240°C, soaking temperature is 1200-1220°C, and the soaking time is 25 hours;

[0044] 2) Rolling process: II-stage rolling process is adopted, in which the second-stage rolling temperature is 830°C, the final rolling temperature is 795°C, the watering temperature of the rolled steel plate is 670°C, and the steel plate is annealed immediately after rolling;

[0045] 3) Annealing process: the temperature of the steel plate entering the furnace is 370°C, the annealing temperature is 850°C, and the holding time is 1.8min / mm. After the holding time is ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

PropertyMeasurementUnit
thicknessaaaaaaaaaa
yield strengthaaaaaaaaaa
hardnessaaaaaaaaaa
Login to View More

Abstract

The invention discloses a steel plate for a high-strength offshore wind power installation platform and a production method thereof, and belongs to the technical field of steel production. The steel plate comprises the following chemical components of, in percentage by weight, 0.40%-0.47% of C, less than or equal to 0.40% of Si, 0.80%-1.20% of Mn, less than or equal to 0.025% of P, less than or equal to 0.010% of S, 0.80%-1.20% of Mo, 0.90%-1.10% of Cr, less than or equal to 0.80% of Ni and the balance Fe and inevitable impurities. The production method comprises the steps of heating, rolling,annealing and heat treatment; and the heat treatment process adopts a quenching and tempering process. The steel plate is high in strength and good in low-temperature toughness, has sufficient toothsurface hardness, completely meets the requirements of offshore wind power installation platforms, particularly steel for key part-lifting platform pile legs.

Description

technical field [0001] The invention belongs to the technical field of steel production, and in particular relates to a steel plate for a high-strength offshore wind power installation platform and a production method thereof. Background technique [0002] The self-elevating cushion offshore wind power installation platform, also known as "offshore wind power installation ship", is mainly used for offshore wind turbines, foundation transportation and installation construction. The platform has four legs, which are firmly inserted into the seabed, and the hull is supported and fixed to form a A stable platform that is not affected by waves is a key weapon for offshore wind power operations from shallow sea to offshore. my country has the largest offshore wind power installation platform with the highest lifting capacity in the world. The platform is composed of two upper and lower hulls. The lower floating body is a closed structure. The legs are easy and quick to insert and ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): C22C38/02C22C38/04C22C38/44C21D8/02C21D1/18C21D1/26