Workflow management system and method and storage medium
A technology of workflow management and process management, which is applied in the field of computer information processing, can solve problems such as file loss, paper consumption, and labor time waste, and achieve the effects of high operating efficiency, low labor cost, and high data security
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0073] Embodiment 1: as figure 1 To manage the flowchart for the process, it specifically includes the following steps:
[0074] S11: order arrangement;
[0075] S12: data review, if the review fails, transfer to step S31, and if the review passes, transfer to S13;
[0076]S13: Check the light-painted manuscript, if it is not a light-painted manuscript, go to step S31, and if it is a light-painted manuscript, go to step S14;
[0077] S14: Determine whether there is a super-factory capacity project, if not, S16, if so, transfer to S15;
[0078] S15: Review whether it has superpowers, if not, go to S16, and if so, go to S24;
[0079] S16: Confirm whether there is an engineering problem, if not, turn to S34, and if so, turn to S31;
[0080] The above steps are all completed by the MI production staff.
[0081] Further, as figure 2 Confirmation management flowchart, including the following steps:
[0082] S31: EQ arrangement;
[0083] S32: Engineering confirmation;
[00...
Embodiment 2
[0096] Embodiment 2: as image 3 As shown, the work flow of the PE department is taken as an example to illustrate;
[0097] Specific steps are as follows:
[0098] S1: Obtain order status from ERP;
[0099] S2: MI order arrangement;
[0100] S3: EQ personnel reply, if there is a reply, transfer to S4, if there is no reply, the process ends;
[0101] S4: MI pending internal review;
[0102] S5: Judging the result of the internal audit, if the internal audit is passed, go to step S6, if the internal audit is not passed, the process ends;
[0103] S6: QAE pending internal audit
[0104] S7: Judgment of the review result, if passed, go to step S8, and if not passed, the process ends;
[0105] S8: MI is completed;
[0106] S9: QAE staff notifies CAM, if there is a file output, it will be transferred to S10, otherwise it will be transferred to S11;
[0107] S10: QAE notifies DCC;
[0108] S11: To be arranged by CAM;
[0109] S12: CAM production in progress;
[0110] S13:...