[0046] Embodiment: The inspection system for rapid switchover inspection system of one-time pressurization and synchronous verification phase of the electrical system, see Figure 1-4 shown. Including generator, main transformer, high-voltage factory transformer, working power inlet switch DL1, working power inlet voltage transformer PT1, factory working section bus voltage transformer PT3, feeder switch DL3, low-voltage factory transformer, three-phase experimental power supply, Backup power inlet switch DL2, backup power inlet voltage transformer PT2, high-voltage backup transformer, factory power quick switching device and factory working section busbar;
[0047] The output end of the generator and one end of the high-voltage factory transformer are respectively connected to the input end of the main transformer;
[0048] The switch knife end of the working power incoming line switch DL1 and the detection end of the working power incoming line voltage transformer PT1 are r...