Sludge backflow and reduction method in electroplating wastewater treatment process
A technology of electroplating wastewater and sludge reflux, which is applied in metallurgical wastewater treatment, degassed water/sewage treatment, neutralized water/sewage treatment, etc. It can solve the problems of comprehensive utilization of secondary sludge and reduce sludge production , Solve the low utilization rate and ensure the effect of reasonable operation
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0017] An electroplating nickel-containing wastewater treatment project, the daily treatment capacity of nickel-containing wastewater is 500 t / d, the raw water pH value is 1.3-2.4, the original treatment process uses lime to adjust the pH value, the lime consumption is 1.6 t / d, and the total sludge output It is 3.1 t / d. The calcium carbonate content in the secondary sludge is 20-32%, and the lime content is 10-15%. Using the process route provided by the present invention, after the secondary sludge is refluxed, the pH value of the primary pH adjustment tank is controlled below 4, the gas-water ratio is 12:1, and the reaction time is 35 min. After 2 consecutive months of stable In operation, the lime consumption is 1.4 t / d, a decrease of 12.5%, and the sludge output is 2.6 t / d, a decrease of 16.1%. The benefit from sludge and lime reduction reaches 700 yuan / d.
Embodiment 2
[0019] In an electroplating comprehensive wastewater treatment project, the daily treatment capacity of comprehensive wastewater is 6000 t / d, and the pH value of the raw water is 1.7-2.6. The original treatment process uses lime to adjust the pH value. The lime consumption is 14.5 t / d, and the sludge output is 39.2 t / d. The calcium carbonate content in the secondary sludge is 17-28%, and the lime content is 8-13%. Using the process route provided by the present invention, after the secondary sludge is refluxed, the pH value of the primary pH adjustment tank is controlled below 4, the gas-water ratio is 15:1, and the reaction time is 30 min. After 6 consecutive months of stable In operation, the lime consumption was 13.4 t / d, a decrease of 7.6%, and the sludge output was 35.7 t / d, a decrease of 8.9%. The benefit from sludge and lime reduction reaches 4,500 yuan / d.