Pre-charging control method and system of frequency converter
A control method and pre-charging technology, applied in electrical components, manufacturing converters, high-efficiency power electronic conversion, etc., can solve the problems of inverter loss failure rate and shorten the service life of inverters
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0038] This embodiment provides a pre-charging control method for a frequency converter, such as figure 1 As shown, the methods include:
[0039] S110. When the target oxygen lance moves from the standby position to the working position, collect the backup position limit signal of the target oxygen lance, and acquire the target oxygen lance when the backup position limit signal is not consistent with the first reference signal. The first movement time of the oxygen gun;
[0040] Generally speaking, in order to prevent the oxygen lance from blowing oxygen in the converter for a long time and cause the oxygen lance to be covered by slag and damage the oxygen lance, each steelmaking converter is equipped with two sets of oxygen lances, and each set of oxygen lances is also equipped with a set of oxygen lance lifting devices , The oxygen lance lifting device is controlled by the corresponding frequency converter, and then controls the oxygen lance lifting. refer to figure 2 , ...
Embodiment 2
[0063] This embodiment provides a pre-charging control device for an inverter, refer to image 3 , the device includes: an acquisition unit 31 and a control unit 32; wherein,
[0064] Generally speaking, in order to prevent the oxygen lance from blowing oxygen in the converter for a long time and cause the oxygen lance to be covered by slag and damage the oxygen lance, each steelmaking converter is equipped with two sets of oxygen lances, and each set of oxygen lances is also equipped with a set of oxygen lance lifting devices , The oxygen lance lifting device is controlled by the corresponding frequency converter, and then controls the oxygen lance lifting. refer to figure 2 , when the first oxygen lance is in the working position, then the second oxygen lance is in the standby position; similarly, when the second oxygen lance is finished and the next batch of molten steel is smelted, the corresponding oxygen lance needs to be moved horizontally The equipment exchanges the...
PUM