Embodiment 1
[0037] Such as Figure 1 to Figure 3 As shown, a construction method for the sinking foundation of an elevator shaft comprises the following steps:
[0038] Pile sinking step: sink the prefabricated pile 22 pre-embedded with the vertical stress rib 221 into the soil to a predetermined depth;
[0039] Bottom plate placement step: put the bottom plate 2 down to the top of the prefabricated pile 22, and use a mechanical connection assembly to connect the vertical stress rib 221 of the prefabricated pile 22 and the second vertical stress tendon 21 of the bottom plate 2;
[0040] Steps for laying the foundation frame: erect the foundation frame 1 on the bottom plate 2, and connect the first vertical stress rib 11 of the foundation frame body 1 and the second vertical stress rib 21 of the bottom plate 2 by using a mechanical connection assembly.
[0041] Such as image 3 with Figure 4 As shown, in the step of laying the bottom plate, at least part of the second vertical rib 21 i...
Embodiment 2
[0056] The same parts as those in Embodiment 1 are given the same reference numerals, and the same text descriptions are omitted.
[0057] With respect to Embodiment 1, this embodiment provides another structure similar to the structure of the upper connection assembly and the lower connection assembly, such as Image 6 As shown, in the step of laying the basic frame, the elastic clip 32 is arranged in the first connecting nut 31. The elastic clip 32 is C-shaped. When the inserting rod 42 is inserted into the first connecting nut 31, the inserting rod 42 penetrates The elastic clip 32, the elastic clip 32 clamps the end face of the plug joint 422 of the insertion rod 42, prevents the insertion rod 42 from withdrawing from the first connecting nut 31, and at the same time, tightens the fastening nut 421, thereby realizing the connection between the upper connection assembly and the lower connection assembly. connected as one. Preferably, the elastic clip 32 may be a snap sprin...
Embodiment 3
[0059] With respect to Embodiment 1, this embodiment provides another structure similar to the structure of the upper connection assembly and the lower connection assembly, such as Figure 7 As shown, in the installation step of the basic frame, the elastic clip 32 is screwed into the first connecting nut 31. When the inserting rod 42 is inserted into the first connecting nut 31, the inserting rod 42 passes through the elastic clip 32, elastically The clip 32 clamps the inserting rod 42 to prevent the inserting rod 42 from withdrawing from the first connecting nut 31, and at the same time, tighten the fastening nut 421, so as to realize the connection of the upper connecting component and the lower connecting component. Preferably, the elastic clip 32 can be an elastic collet.