Railway sand damage road section sand burial detection device
A detection device and sand damage technology, which is applied in the direction of measuring devices, weighing indicating devices, instruments, etc., can solve problems such as low efficiency, low intelligence, and poor real-time detection, so as to reduce workload and improve intelligence Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0031] Such as Figure 1-4 As shown, the embodiment of the present invention provides a sand burial detection device for a railway sand hazard road section, including a machine housing 1 and a pressure sensor 2, a control panel 3 and a mobile battery 5 respectively arranged inside the machine housing 1 for utilizing The pressure sensor 2 detects sand damage in real time, and can send the detected data signal to the control panel 3 in real time and accurately, and then the control panel 3 sends an alarm message, which can effectively avoid the failure to find out in time after the sand burial occurs, which will cause traffic safety to be affected. Hazardous situations occur. The specific settings are as follows:
[0032] Such as figure 1 As shown, the machine housing 1 adopts a square non-metallic shell structure with open upper and lower ends. The inside of the machine housing 1 is integrally provided with a partition 11, which is used to use the partition 11 to separate the...
Embodiment 2
[0041] In embodiment 2, for the same structure as in embodiment 1, give the same symbol, omit the same description, embodiment 2 has made improvement on the basis of embodiment 1, as Figure 5 As shown, the bottom end of the casing 1 is fixedly connected with an L-shaped connecting plate 71 through an external screw, and the L-shaped connecting plate 71 is provided with a positioning clip 7 at an end far away from the casing 1. The positioning clamp body 7 is provided with two pieces, and the two positioning clamp bodies 7 are clamped on both sides of the bottom end of the track 9 respectively, and there is a utility between the L-shaped connecting plate 71 and the two positioning clamp bodies 7. Due to the fixed mounting bolts 72, the relative heights of the upper surface of the pressure-bearing cover plate 4 and the upper surface of the bottom end of the track 9 are consistent, effectively ensuring the stability of the structure.
[0042] The using method of the sand burial ...