Unlock instant, AI-driven research and patent intelligence for your innovation.

Slab joint rubber strip waterproof device of assembled building precast concrete slab

A technology of prefabricated concrete slabs and waterproof devices, applied in buildings, building components, building structures, etc., can solve problems such as uneven rubber surface, water seepage, water leakage, and falling off, and achieve good waterproof performance, tight fit, and good waterproof performance Effect

Active Publication Date: 2020-06-02
SHANGHAI BRIGHT INTELLIGENT CURTAIN WALL +1
View PDF4 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

The curtain walls of prefabricated buildings often use prefabricated concrete slabs. However, after the precast concrete slabs are installed, there are often gaps between the slabs, which can easily lead to water seepage, reduce the life of the curtain wall, and cause the curtain wall to be easily damaged or even fall off.
[0003] At present, in the usual design and construction, in order to achieve the purpose of waterproofing the board seams, the traditional design is to reserve 15mm board seams, fill the board seams with foam rods, and use weather-resistant sealant glue technology, but this method is easy to cause board surface pollution. The glue surface is uneven, time-consuming and labor-intensive

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Slab joint rubber strip waterproof device of assembled building precast concrete slab
  • Slab joint rubber strip waterproof device of assembled building precast concrete slab
  • Slab joint rubber strip waterproof device of assembled building precast concrete slab

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0054] refer to figure 1 , figure 2 As shown, a prefabricated building prefabricated concrete slab seam waterproof device, the precast concrete slab 1 includes a first panel 101 and a second panel 102 arranged adjacently, the waterproof device is arranged on the first panel 101 At the plate seam between the second plate 102, a first through groove 1011 is provided on the plate seam side of the first plate, and a second through groove 1021 is provided on the plate seam side of the second plate 102, so The first through-slot 1011 and the second through-slot 1021 are arranged opposite to each other and construct the assembly area A of the waterproof device, and the waterproof device forms at least two waterproof structures from the beginning to the end;

[0055] It also includes a first profile 201 and a second profile 202 respectively assembled in the first through groove and the second through groove, and a waterproof rubber strip 6 matching the first and second profiles, and...

Embodiment 2

[0069] Compared with the assembly structure of Embodiment 1, this embodiment specifically models the structure of the waterproof rubber strip 6 .

[0070] Such as Figure 5 As shown, the waterproof rubber strip 6 includes a snap-in fixing part 601, and an extension part 602 connected with the snap-in fixing part 601, and the end of the extension part is provided with an abutment part 603; A through hole is arranged in the center of the section of the extension part.

[0071] A through hole is set in the center of the cross section of the snap-in fixing part 601 and the extension part 602. Firstly, the setting of the overall through-hole saves material, and secondly, the through-hole is provided in the snap-in fixing part to facilitate assembly. The hole can make the entire snap-in fixing part soft and easy to squeeze into the drawing slot; then the extension part is provided with a through hole with a certain degree of elasticity, and cooperates with the abutment part to faci...

Embodiment 3

[0076] Except as described in Example 1 and Example 2, as Figure 7 As shown, the above-mentioned first profile, the long-length film and the first plate are connected and assembled through through fasteners.

[0077] The fasteners are used to assemble and connect the first section bar, the long film and the first plate, which is convenient for disassembly and combined installation at any time, and the fasteners are structures that are convenient for disassembly.

[0078] Among them, the fasteners use M6 cross-through bolts 4, which are used to fix the metal profiles on the concrete slab. The existing M6 cross-through bolts can meet the construction requirements. The specific shear force of the M6 ​​bolts: 24.38MPa, can withstand 50kg, the stress cross-sectional area of ​​the M6 ​​nut: 20.1 square millimeters, so the shear stress = 50*9.8 / 20.1 = 24.38MPa. Specifically, bolt holes are provided in the first through-slot, and the first profile is fixed in the first through-slot ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

PropertyMeasurementUnit
Shear forceaaaaaaaaaa
Login to View More

Abstract

The invention relates to a slab joint rubber strip waterproof device of an assembled building precast concrete slab, wherein the precast concrete slab comprises a first plate and a second plate arranged adjacently. The waterproof device is arranged at the slab joint between the first plate and the second plate, a first through groove is formed in the slab joint side of the first plate, a second through groove is formed in the slab joint side of the second plate, the first through groove and the second through groove are oppositely arranged and constitute an assembly area of the waterproof device, and the waterproof device forms at least two waterproof structures from the initial end to the tail end. The waterproof structure further comprises a first section bar and a second section bar assembled in the first through groove and the second through groove respectively, and a waterproof rubber strip matched with the first section bar and the second section bar, the waterproof rubber stripdeforms after extruding the section bars to form a waterproof barrier of the waterproof structure. Compared with the prior art, the device disclosed by the invention has the beneficial effect of effectively improving the waterproof performance of the precast concrete slab, thereby improving the quality of the precast concrete slab.

Description

technical field [0001] The invention relates to a waterproof device for a rubber strip for a slab seam, in particular to a waterproof device for a rubber strip for a slab seam of a prefabricated concrete slab in an assembled building. Background technique [0002] A building assembled from prefabricated parts on the site is called a prefabricated building. The curtain wall is the outer wall enclosure of the building. It is not load-bearing and hangs up like a curtain, so it is also called "curtain wall". A light wall with a decorative effect commonly used in buildings. The curtain walls of prefabricated buildings often use precast concrete slabs. However, after the precast concrete slabs are installed, there are often gaps between the slabs, which can easily lead to water leakage, reduce the life of the curtain wall, and cause the curtain wall to be easily damaged or even fall off. [0003] At present, in the usual design and construction, in order to achieve the purpose of...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): E04B2/88E04B1/68E04B1/684
CPCE04B2/88E04B1/68E04B1/6801E04B1/6806
Inventor 宋凌月陆凯刘铭赵龙君张桦王平山李进军白杨
Owner SHANGHAI BRIGHT INTELLIGENT CURTAIN WALL
Features
  • R&D
  • Intellectual Property
  • Life Sciences
  • Materials
  • Tech Scout
Why Patsnap Eureka
  • Unparalleled Data Quality
  • Higher Quality Content
  • 60% Fewer Hallucinations
Social media
Patsnap Eureka Blog
Learn More