Connection method for turning end of corrugated steel plate
A technology of corrugated steel plate and connection method, which is applied in infrastructure engineering, protection devices, buildings, etc., can solve the problems of strength defect of corrugated steel plate, strengthen the turning end of corrugated steel plate, etc., and achieve the effect of ensuring the effect of subsequent structural operation.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0025] The connection method of the turning end of the vertical corrugated steel plate and the turning end of the arc corrugated steel plate.
[0026] In this embodiment, a method for connecting the turning end 6 of the vertical corrugated steel plate and the turning end 7 of the arc corrugated steel plate includes the following steps:
[0027] S1, the turning end 6 of the vertical corrugated steel plate is connected with the turning end 7 of the arc corrugated steel plate through the channel steel, the first angle steel in turn;
[0028] Such as figure 1 As shown, the channel steel includes a web 11, a left wing 12 and a right wing 13, the angle steel includes a first part 21 and a second part 22, and the turning end 6 of the vertical corrugated steel plate is connected to the left side of the channel steel through the first fastening bolt 3. The side wings 12 are fixedly connected, the right side wing 13 of the channel steel is fixedly connected to the first part 21 of the ...
Embodiment 2
[0033] The connection method between the turning end of the vertical corrugated steel plate and the concrete foundation.
[0034] In this embodiment, a method for connecting the turning end 6 of the vertical corrugated steel plate to the concrete foundation 8 includes the following steps:
[0035] S1. The turning end 6 of the vertical corrugated steel plate is connected to the concrete foundation 8 through two angle steels in turn;
[0036] Such as figure 2 As shown, the first angle steel is poured into the concrete at the turning end 6 of the fixed vertical corrugated steel plate. The second part 22 is flush with the ground plane 9;
[0037] The turning end 6 of the vertical corrugated steel plate is fixedly connected with the first part 21 of the first angle steel through the first fastening bolt 3, and the second part 22 of the second angle steel is connected with the first part 21 of the first angle steel through the second fastening bolt 4. Two parts 22 are fixedly co...
Embodiment 3
[0042] The invention relates to a connection method between the turning end of the arc corrugated steel plate and the concrete foundation.
[0043] In this embodiment, a method for connecting the turning end 7 of the arc corrugated steel plate and the concrete foundation 8 includes the following steps:
[0044] S1. The turning end 7 of the circular arc corrugated steel plate is connected with the concrete foundation 8 through two angle steels in turn;
[0045] Such as image 3 As shown, the first angle steel is poured into the concrete at the turning end 7 of the fixed arc corrugated steel plate, and the first part 21 of the second angle steel is pre-embedded in the foundation 8 at the ground level 9 of the construction area, and the first part 21 of the second angle steel The second part 22 is flush with the ground plane 9;
[0046] The turning end 7 of the arc corrugated steel plate is fixedly connected with the first part 21 of the first angle steel through the first fast...