A method for maintaining the stability of false roof filling in a single approach downward and recovering the spacer
A technology for filling and stabilizing the approach, which is applied in the direction of filling, earth square drilling, underground mining, etc. It can solve the problems of unrecoverable ore body and large loss of ore volume, so as to simplify the construction process, improve the recovery rate and ensure recovery safe effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0025] The invention relates to a method for maintaining the stability of filling a false roof in a single approach downward and recovering the intercolumn. The method can not only recover the intercolumn but also maintain the stability of filling the false roof in a single approach downward. That is to go back to the ore bodies in the two adjacent columns of the mining room first, and then drive super-long prestressed bolts with a certain row spacing into the surrounding rocks of the upper and lower walls in the vertical direction of the ore body in the inter-columns. By laying the reinforcement mesh in the inter-column, the exposed end of the long anchor rod is welded firmly with the reinforcement mesh. Then the layered intercolumn is cemented and filled. In this way, the filling body of the replacement column, the steel mesh, the super-long anchor rod and the filling false roof in the mine house can be formed as a whole, thereby ensuring that the filling body of the replace...
Embodiment 2
[0038] In order to further illustrate the beneficial effect of a method of maintaining the stability of filling the false roof in a single downward approach and recovering the studs, the actual mining of a gold mine is taken as an example to describe in detail.
[0039] According to the specific geological data and mining technical conditions of a gold mine, the ore body is 150-200m away from the surface, the average thickness is 5.0m, the average length of the stope ore body is 40m, and the total length of the columns on both sides of the adjacent stope is 15m (each 7.5m) , the height is 50m, the dip angle is about 75°, the average ore grade is 3.98g / t, and the ore body itself is extremely broken. The lithology of the ore is pyrite sericite, and the natural collapse phenomenon is serious; the surrounding rock of the ore body is sericized granite, the hanging wall of the ore body is extremely broken, the stability of the foot wall is average, and the thickness is more than 2m, ...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 