Construction method for controlling the breakage of segmental misalignment
A construction method and segment technology, which is applied in earthwork drilling, shaft equipment, wellbore lining, etc., and can solve problems such as damage and segment misalignment
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0025] The present invention will be further described below with reference to the accompanying drawings and specific embodiments.
[0026] see figure 1 , The present invention provides a construction method for controlling the staggered damage of the segment, which is used to solve the problem that during the construction of the existing shield machine, the load of the trolley and the equipment bridge on the segment is easy to cause the segment to be eccentrically compressed and the force is concentrated. Causes the problem of misplacement and damage. The construction method of the invention disperses the pressure acting on the segment directly under the front wheel pair of the No. 1 trolley by extending the track, increasing the number of wheel pairs or adding a plurality of guide wheels, so as to ensure that the multiple segments are stressed, thereby dispersing the concentrated load , to solve the problem that the segment is damaged in the wrong stage. The following desc...