Accurate processing method of arch dam vertical line monitoring data
A technology of monitoring data and processing methods, which is applied in the field of accurate processing of arch dam vertical line monitoring data, can solve problems such as errors in arch dam displacement measurement values, achieve good technical support, and avoid the effect of monitoring data processing errors
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0021] This example is an accurate processing method for arch dam vertical line monitoring data, the steps are as follows:
[0022] The coordinate system adopted in the arch dam construction layout drawing is taken as the overall coordinate system (x, y), and the general coordinate system is arranged along the river and across the river;
[0023] Taking the overall coordinate system (x, y) as a reference, the vertical measuring point positions (PL1-1 measuring point, PL1-2 measuring point and IP1-1 measuring point) at different elevations are established respectively, and the tangential and The local coordinate system (x', y'), (x", y"), (x"', y"') where the radial direction is the coordinate axis;
[0024] According to the calculation of the arch dam shape equation, the coordinate transformation matrix of the corresponding local coordinates of each measuring point to the global coordinate system (the local coordinate system is represented by the basis vector of the global coo...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


