Unlock instant, AI-driven research and patent intelligence for your innovation.

Large-span outer cornice assembly type suspended ceiling structure and construction method

A construction method and prefabricated technology, applied in ceilings, building components, building structures, etc., can solve the problems of ceiling falling off, locking pendant falling out, etc., and achieve the effect of improving the firmness of installation

Active Publication Date: 2020-09-11
鹏森建设集团有限公司
View PDF7 Cites 2 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] However, in the above structure, if it is installed outdoors, when the curved ceiling is subjected to wind force, the veneer is subjected to an upward force, and the locking pendant is easy to come off from the connecting cross bolt, thus causing the ceiling to fall off.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Large-span outer cornice assembly type suspended ceiling structure and construction method
  • Large-span outer cornice assembly type suspended ceiling structure and construction method
  • Large-span outer cornice assembly type suspended ceiling structure and construction method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0039] Embodiment 1: Reference figure 1 and figure 2, is an assembled suspended ceiling structure of a large-span outer floating eaves disclosed in the present invention, including a connecting column 1, the connecting column 1 is vertically arranged, the upper end of the connecting column 1 is used to be installed under the outer floating eaves 2, and the outer floating eaves 2 It is a steel beam truss structure, including lower chord node spheres 21 and connecting beams 22, one connecting column 1 is arranged on each lower chord node sphere 21, and then a plurality of connecting columns 1 are arranged along the connecting beams 22 according to load requirements, The connecting column 1 located on the lower chord node sphere 21 is connected by a flange, which can reduce on-site welding operations. A connecting seat 3 is arranged on the connecting beam 22, and the connecting column 1 located on the connecting beam 22 is connected to the connecting seat 3 by a flange , so tha...

Embodiment 2

[0045] Embodiment two: reference figure 1 and figure 2 , which is a construction method for a prefabricated suspended ceiling structure of a large-span external eaves disclosed in the present invention. The construction of a prefabricated suspended ceiling structure for a large-span external eaves disclosed in Embodiment 1 includes firstly constructing under the external eaves 2 Scaffolding is set up, and the scaffolding can be set up full of scaffolding or suspended under the outer eaves 2. When hanging the scaffolding, the scaffolding can be assembled in pieces on the ground first, and then the scaffolding can be hung in pieces under the outer eaves 2. And be installed on the outer eaves 2, the decorative plate 8 blocked by the scaffold can be installed after the scaffold is folded off, and the suspended scaffold can be installed to save man-hours and costs when compared with the scaffolding installed in the whole house.

[0046] After the scaffolding is installed, the sta...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to a large-span outer cornice assembly type suspended ceiling structure. The large-span outer cornice assembly type suspended ceiling structure comprises a connecting pillar. Oneend of the connecting pillar is used for being fixed to an outer cornice, and the other end of the connecting pillar is connected with a main keel. Subsidiary keels are arranged below the main keel.The multiple subsidiary keels are arranged in the length direction of the main keel. Hinges are arranged between the main keel and the subsidiary keels. Multiple decorative plates are arranged betweenevery two adjacent subsidiary keels. The large-span outer cornice assembly type suspended ceiling structure has the beneficial effect that a curved surface suspended ceiling mounted outdoors is firm.

Description

technical field [0001] The invention relates to the technical field of a suspended ceiling structure, in particular to an assembled suspended ceiling structure with a large-span outer floating eaves and a construction method. Background technique [0002] In the construction of public facilities, the metal ceiling has shown almost perfect performance, and the decorative appearance is also very varied, and has been widely used in practical projects. At present, in most metal plate ceiling projects, the ceiling of the main body of the building is mostly a flat structure. The metal plate ceiling adopts a flat steel skeleton keel to hoist the metal plate for installation and splicing, which is simple to assemble and convenient to construct. [0003] The patent document with the authorized notification number CN204023868U discloses a curved ceiling structure, which includes several decorative panels and several decorative panel fixing parts, and the decorative panel fixing parts ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): E04B9/00E04B9/06E04B9/12E04B9/16E04B9/28E04D13/158
CPCE04B9/00E04B9/06E04B9/12E04B9/16E04B9/28E04D13/158
Inventor 邢耀鹏邢国杰胡留东孙喜军常艳涛张玉新
Owner 鹏森建设集团有限公司
Features
  • R&D
  • Intellectual Property
  • Life Sciences
  • Materials
  • Tech Scout
Why Patsnap Eureka
  • Unparalleled Data Quality
  • Higher Quality Content
  • 60% Fewer Hallucinations
Social media
Patsnap Eureka Blog
Learn More