Novel pipe jacking method for preparing thick-walled steel pipe
A technology for pipe jacking and steel pipes, which is applied in the field of new pipe jacking for the preparation of thick-walled steel pipes. It can solve the problems that the mandrel length cannot be effectively used, the extension of pipe jacking is small, and the length of pipe jacking is short, so as to improve the utilization rate and increase the jacking capacity. Pipe length, the effect of increasing the pipe jacking length
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0052] The thick-walled steel pipe with a diameter of 230mm and a mandrel rod with a diameter of 145mm is used to produce thick-walled steel pipes for pipe jacking. The outer diameter of the prefabricated thick-walled steel pipes is 180mm and the wall thickness is 18.5mm. The specific method is as follows:
[0053] (1) Perforation processing step: the continuous casting slab is selected as a tube blank with a diameter of 230mm and a length of 3.25m, and the above-mentioned continuous casting slab is perforated to obtain a perforated capillary. The diameter of the perforated capillary is 232mm, the wall thickness is 39mm, and the length is 5.6m, the length of the perforated capillary 5.6m is the maximum length of the perforation.
[0054] (2) Pipe jacking step: use a mandrel with a diameter of 145mm to carry out pipe jacking treatment on the perforated capillary to obtain a waste pipe. The diameter of the waste pipe is 182.6mm, the wall thickness is 18.3mm, and the length is 13...
Embodiment 2
[0061] A thick-walled steel pipe with a continuous casting billet diameter of 270mm and a mandrel diameter of 180mm was used to implement the pipe jacking process. The outer diameter of the prefabricated thick-walled steel pipe was 219mm and the wall thickness was 20mm. The specific method is as follows:
[0062] (1) Perforation processing steps: the continuous casting slab is selected as a tube blank with a diameter of 270mm and a length of 3.00m, and the above-mentioned continuous casting slab is perforated to obtain a perforated capillary. The diameter of the perforated capillary is 272mm, the wall thickness is 41.5mm, and the length is 5.6m, and the length of the perforated capillary is 5.6m, which is the maximum length of the perforation.
[0063] (2) Pipe jacking step: use a mandrel with a diameter of 180mm to perform pipe jacking on the perforated capillary to obtain a waste pipe, which has a diameter of 220.4mm, a wall thickness of 19.8mm, and a length of 13.3m.
[00...
PUM
| Property | Measurement | Unit |
|---|---|---|
| diameter | aaaaa | aaaaa |