Auxiliary blasting construction technology in rotary drilling hole used for rock-socketed pile foundation
A construction technology, a technology in drilling, applied in blasting, foundation structure engineering, sheet pile walls, etc., can solve the problems of not maximizing the effect, long drilling time, high drilling cost, etc., to avoid low construction efficiency, The effect of shortening the process time and avoiding hidden dangers of quality and safety
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0021] An auxiliary blasting construction technology in a rotary drilling borehole for a rock-socketed pile foundation, comprising the following steps:
[0022] S1. Construction preparation, first excavate in place on the working platforms of piers 1, 2, and 3 on the left, the effective pile length is 18 meters, and the rock-socketing depth is 18 meters, and then prepare a down-the-hole drilling rig (type 200, drilling tool diameter 138mm ), 160mm diameter liner 60 meters, one Sany rotary drilling rig (SR425);
[0023] S2. Hole position layout, since the pile foundation platform of No. 1, 2, and 3 pier on the left is located on the gneiss bedrock, the down-the-hole drilling has canceled the mold, and the hole is directly drilled after the measurement and lofting. The diameter of the pile foundation is 2.2 meters. The depth is 18 meters, the number of drilling holes is 12, and the cumulative construction time is 24 hours. The hole depth is measured after the hole is formed to p...
Embodiment 2
[0029] S1. Construction preparation, prepare a down-the-hole drilling rig (type 200, drilling tool diameter 138mm), a set of drilling molds (12 holes with a diameter of 2.2 meters) (9 holes with a diameter of 2.0 meters), a liner with a diameter of 160 mm, 60 meters, One Sany rotary drilling rig (SR425).
[0030] S2. The 2-4 meters of covering soil on pier No. 1 and No. 2 on the right is medium-weathered gneiss. For pile foundations such as blasting and pre-cracking, a rotary drilling drill is required to drill holes to install the casing first. After the rotary drilling rig reaches the rock Withdraw the hole position and use a crane to install the mold. The surveyor is responsible for measuring that the center of the mold is consistent with the center of the pile foundation, the top surface of the mold is horizontal, and the verticality of the vertical guide pipe is less than 1%. After the measurement is passed, insert the inner liner pipe with a diameter of 160mm into the mol...
PUM
| Property | Measurement | Unit |
|---|---|---|
| Diameter | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
Login to View More