Gas control, extraction and utilization integrated deep coal resource development method
A gas and deep technology, applied in the field of gas development and utilization, can solve problems such as affecting the effect of gas treatment, poor extraction environment, and inability to use gas resources.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0017] The specific technical solutions of the present invention are described in conjunction with the accompanying drawings.
[0018] refer to figure 1 It can be seen that the integrated deep coal resource development method of gas control, drainage and utilization includes the following steps:
[0019] Step 1: According to the mining depth and construction conditions, conduct research and analysis on the stability of roadways in different positions, drilling construction conditions, and the effects of outburst prevention and drainage, select a suitable bottom extraction roadway position and excavate machine roadway 23 and wind roadway 24 , arrange the drainage pipeline 3 of the machine lane drainage lane, and start the pre-extraction of the layer-crossing drilling 1 at the opening 1m of the machine lane drainage lane 25 on the working face, the hole spacing of the layer-crossing drilling 1 is 4.8m, and each group has 11 holes In the gas anomaly zone, the interval between dr...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


