A dynamic scheduling method and system for track-guided vehicles
A dynamic scheduling, vehicle technology, applied in control/regulation systems, general control systems, program control, etc., can solve the problems of not considering the global work efficiency and the low global scheduling efficiency, so as to improve the global scheduling efficiency and improve the material processing efficiency. Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0060] figure 1 It is a method flow chart of the dynamic scheduling method for track-guided vehicles according to Embodiment 1 of the present invention.
[0061] see figure 1 , the dynamic scheduling method of the track-guided vehicle is applied to a material processing system, the material processing system includes: 8 CNC machine tools and a track-guided vehicle, and the 8 CNC machine tools are divided into two groups and symmetrically distributed in the On both sides of the track-guided vehicle, each group of CNC machine tools is evenly distributed along the front and rear directions of the track-guided vehicle; a feeding conveyor belt is arranged on the left side of the track-guided vehicle, and The right side of the guided vehicle is provided with a blanking conveyor belt; each of the CNC machine tools is used to complete a process for processing materials; Clean the clinker and transfer the cleaned material to the unloading conveyor belt;
[0062] The dynamic scheduli...
Embodiment 2
[0185] In this embodiment, the linear programming model for RGV dynamic scheduling is determined by using the AHP, and the optimal solution is obtained through the tabu search algorithm. Combined with the dual robust re-scheduling model, the optimal scheduling strategy and system for RGV in different situations are given. work efficiency.
[0186] Aiming at the situation that there is no fault in a process, firstly, a Cartesian coordinate system is established for the material processing system. In order to maximize the benefit of the material processing system within the specified time, the relevant factors that affect the RGV dynamic scheduling are analyzed and obtained (RGV’s effect on different CNCs) Motion operation time indicator, CNC average waiting queue indicator, CNC average utilization indicator, CNC average waiting time indicator). Then, using AHP, the weights of the above-mentioned factors are determined. Finally, the dynamic scheduling model of RGV is establishe...
Embodiment 3
[0371] The invention also discloses a dynamic dispatching system for rail-guided vehicles, which is applied to a material processing system, and the material processing system includes: 8 CNC machine tools and a rail-guided vehicle, and the 8 CNC machine tools are divided into two groups Symmetrically distributed on both sides of the track-guided vehicle, each group of CNC machine tools is evenly distributed along the front and rear directions of the track-guided vehicle; a feeding conveyor belt is arranged on the left side of the track-guided vehicle, The right side of the track-guided vehicle is provided with a blanking conveyor belt; each of the CNC machine tools is used to complete a process for processing materials; the track-guided vehicle is used to complete the loading and unloading of each of the CNC machine tools, Clean the processed clinker and transfer the cleaned material to the unloading conveyor belt;
[0372] The dynamic scheduling system includes: a single-pro...