A bridge erecting machine and distance technology, which is applied in the field of long-distance rapid transfer of bridge erecting machines, can solve the problems of high requirements for transfer transportation equipment, long transfer construction period, and high safety risk of hoisting, and achieve low demand for equipment and personnel , Reduce dismantling and assembly, and strong operability
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0044] like figure 1 As shown in ~ 6, a method for a long-distance rapid transition of a bridge erecting machine includes the following steps:
[0045] S1. Site preparation to ensure that the roadbed 1 is compacted and leveled;
[0046] S2. Lift the hydraulic system of the bridge erecting machine, lift the main beam 2 and ensure that the main beam 2 is in a horizontal state;
[0047] S3. The transport device 3 is driven to the position of the beam below the main beam 2 of the bridge erecting machine;
[0048] S4. Adjust the positions of the front outrigger traverse track 41 of the front outrigger 4 and the middle outrigger traverse track 51 of the middle outrigger 5, and use the overhead crane 6 to move the front outrigger traverse track 41 and the middle outrigger respectively. The leg traverse track 51 is hoisted to the working platform 7 of the transport device 3;
[0049] S5. Fix the front outrigger traverse rail 41 and the middle outrigger traverse rail 51 on the worki...