Building pile foundation construction mud processing device
A technology for construction mud and processing equipment, which is applied in wellbore/well components, earthwork drilling, flushing wellbore, etc., which can solve the problems of low efficiency of mud replenishment and achieve high overall efficiency
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0032] The following is attached Figure 1-4 The application is described in further detail.
[0033] The embodiment of the present application discloses a construction pile foundation construction mud processing device. refer to figure 1 and figure 2 The construction pile foundation construction mud treatment device includes a conveying mechanism 1, a filter mechanism 2 for filtering drilling slag in the mud, and a discharge mechanism 3 for discharging the filtered drilling slag into the unloading truck. The drilling slag feed end is connected to the drilling slag output end of the filtering mechanism 2, and a mud pool 4 for placing mud is provided on the ground. The mud output end of the filter mechanism 2 is connected to the mud pool 4 through a pipeline, and a mud pump 41 is arranged in the mud pool 4 to transport the mud into the borehole. The edge of the upper opening of the borehole is higher than the ground and an overflow hole for discharging the mud is opened on...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


