A construction method and filling body technology, applied in the field of mining, can solve problems such as incomplete consideration of random factors, inappropriate function functions, and failure to consider the impact, etc., to achieve the best practical value, high accuracy of calculation results, and simple and convenient operation
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0054] This embodiment provides a method for constructing a filling body strength matching system, such as figure 2 shown, which includes:
[0055] S1. Select several main factors that affect the force of the cemented backfill; including the strength σ of the cemented backfill, the size of the cemented backfill (length L, width W, height H), and the internal friction angle of the cemented backfill Internal friction angle of side wall rock The internal friction angle between the cemented filling body and the surrounding rock wall Internal friction angle of non-cemented tailings filling Bulk density of cemented filling body γ, bulk density of roof loose rock γ 1 , bulk density of stope side rock γ 2 , bulk density of uncemented filling tailings γ 3 .
[0056] S2. Select a functional function containing multiple main factors, and introduce multiple main factors into the functional function as random variables; the functional function is
[0057]
[0058] S3. Each r...
Embodiment 2
[0080] This embodiment provides a filling body strength matching method, which uses the filling body strength matching system provided in Embodiment 1, such as figure 2 shown, which includes:
[0081] S1. Use cyclic calculation to screen out the strength value of the corresponding cemented filling body under the condition of reliability probability ≥ 90%;
[0082] S2. Using the strength characteristic database, find the raw material ratio of the cemented filling body under the condition that the strength value of the cemented filling body is satisfied.
[0083] Since the amount of cement in the process of mine cementation filling directly determines the filling cost, the cost analysis of the primary selection results is carried out, and the proportioning scheme with the smallest amount of cement is selected under the condition of meeting the strength requirements, so as to realize the filling strength under different structural parameters. Proportional matching process.
[...