Unlock instant, AI-driven research and patent intelligence for your innovation.

On-site calibration method based on unification of three-phase three-wire electric energy meter and three-phase four-wire electric energy meter

A three-phase four-wire, three-phase three-wire technology, applied in the field of electric energy meter calibration, can solve the problems of confusion and misuse of equipment, increase difficulty in on-site operation and maintenance, etc., and achieve the effect of improving work efficiency, simple and reliable operation

Pending Publication Date: 2020-12-29
浙江共同电子科技有限公司
View PDF0 Cites 2 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

Since the three-phase three-wire and three-phase four-wire methods of on-site electric energy meters exist at the same time, the traditional calibration method will use different calibration equipment and calibration methods, which will increase the difficulty of on-site operation and maintenance, and easily cause confusion and misuse of equipment. A reliable verification method and equipment that can simultaneously verify three-phase three-wire and three-phase four-wire electric energy meters can bring great convenience to the actual operation and maintenance work, and greatly improve the work efficiency of on-site operation and maintenance

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0015] The technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the embodiments of the present invention. Apparently, the described embodiments are only some of the embodiments of the present invention, not all of them. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the protection scope of the present invention.

[0016] An on-site verification method based on a unified three-phase three-wire electric energy meter and a three-phase four-wire electric energy meter uses a three-phase four-wire power calibrator for calibration, and the three-phase four-wire power calibrator is equipped with a magnetic The holding relay is used to switch one of the B-phase and N-phase in the circuit wire as the system ground of the equipment. The specific steps are as follows:

[0017] S1: Wiring, connect ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses an on-site calibration method based on unification of a three-phase three-wire electric energy meter and a three-phase four-wire electric energy meter. A three-phase four-wireelectric power calibrator is adopted for calibration, and a path of magnetic latching relay is installed on the three-phase four-wire electric power calibrator and used for switching one of a B phaseand an N phase in a circuit wire to serve as a system ground of equipment. According to the method, the three-phase three-wire and three-wire four-wire unified metering mode can be realized by using one path of magnetic latching relay to switch one of the B phase and the N phase to serve as the system ground of the equipment through one set of power calibrator, the operation is simple and reliable, and through calibration of the three-phase three-wire and three-phase four-wire electric energy meters, great convenience is brought to actual operation and maintenance work, and the working efficiency of on-site operation and maintenance is greatly improved.

Description

technical field [0001] The invention belongs to the technical field of electric energy meter calibration, and in particular relates to an on-site calibration method based on the unity of three-phase three-wire electric energy meters and three-phase four-wire electric energy meters. Background technique [0002] With the advancement of the State Grid and China Southern Power Grid's smart grid construction, hundreds of millions of energy meters are currently being installed, and the number of installed energy meters in the State Grid alone has reached 450 million. With the gradual increase in the number of installed electric energy meters and the increase in operating time, the problems of on-site electric energy meters have gradually accumulated. As a measuring instrument, especially its measurement accuracy has attracted much attention. An effective and convenient on-site electric energy meter calibration method can effectively solve the problem of error calibration in the p...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): G01R35/04
CPCG01R35/04
Inventor 王涛姚云委胡文涛贺兴春
Owner 浙江共同电子科技有限公司