A Formwork-free Rapid Construction Pier Column Based on Centrifugal Method
A template-free, centrifugal technology, applied in the direction of mold panels, molds, mold trays, etc., can solve the problems of poor assembly flexibility, high transportation costs, low turnover efficiency, etc., to increase service life, simple and fast connection, and save template costs. Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0045] see Figure 1-9 , a formwork-free rapid construction pier based on the centrifugal method, including a first prefabricated tubular membrane shell 1 and a second prefabricated tubular membrane shell 8, the first prefabricated tubular membrane shell 1 is located at the second prefabricated tubular membrane shell 8 Directly below the upper pipe end of the prefabricated tubular membrane shell 1 and the second prefabricated tubular membrane shell 8 are provided with a first pipe end connection steel plate 2, the prefabricated tubular membrane shell 1 and the second prefabricated tubular membrane shell 8 are provided with a second pipe end connection steel plate 12 at the port of the lower pipe end; it should be noted that the first prefabricated tubular formwork 1 and the second prefabricated tubular membrane shell 8 are prefabricated by the centrifugal method in the factory, and the material is fiber Concrete, thin-walled tubular shell with standardized section length; the ...
Embodiment 2
[0050] see Figure 1-9 , the formwork-free rapid construction pier column based on the centrifugal method, the first prefabricated tubular formwork 1, the second prefabricated tubular formwork 8, the first pipe end connecting steel plate 2 and the second pipe end of the standard section are produced in the factory The connecting steel plate 12, the prefabricated tubular formwork and the connecting steel plate at the pipe end are prefabricated in the factory at the same time and connected by pre-embedded steel bars.
[0051] According to the design length of the pier column, the first prefabricated tubular formwork 1 and the second prefabricated tubular formwork 8 of multiple sets of standard sections are spliced on site, and the two sets of first hoops 11 are attached to the first prefabricated tubular formwork through bolt hoops. At the upper top of the molded membrane shell 1, two sets of second hoops 14 are attached to the lower bottom of the second prefabricated tubular ...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


