An environmental protection construction method and device
A construction method and an environmentally friendly technology, applied in the processing of building materials, construction, building construction, etc., can solve problems such as noise pollution and impact, and achieve the effect of reducing noise and reducing noise generation
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0023] like figure 1 As shown, the embodiment of the present application provides an environmental protection construction method, wherein the method includes:
[0024] Step S100: obtaining first construction project information;
[0025] Specifically, the first construction project information includes construction time, location, unit, etc., as well as the type of construction project, including information such as whether the construction project is an office building or a civil residence. By obtaining the first construction project information, it is convenient to Further judge whether it is an environmentally friendly construction.
[0026] Step S200: obtaining construction component information according to the construction project information;
[0027] Specifically, the construction component information is each element of the building, including: floor, wall, pillar, etc., as well as information such as steel components required for construction, and the construction...
Embodiment 2
[0090] Based on the same inventive concept as an environmental protection construction method in the foregoing embodiment, the present invention also provides an environmental protection construction device, such as figure 2 As shown, the device includes:
[0091] The first obtaining unit 11: the first obtaining unit 11 is used to obtain the first construction project information;
[0092] Second obtaining unit 12: the second obtaining unit 12 is configured to obtain construction component information according to the construction project information;
[0093] The third obtaining unit 13: the third obtaining unit 13 is used to obtain the noise information of loading and unloading of the construction component according to the information of the construction component;
[0094] Fourth obtaining unit 14: the fourth obtaining unit 14 is used to obtain a predetermined loading and unloading noise threshold;
[0095] The first judgment unit 15: the first judgment unit 15 is used ...
Embodiment 3
[0136] Reference below image 3 to describe the electronic device of the embodiments of the present application.
[0137] image 3 A schematic structural diagram of an electronic device according to an embodiment of the present application is shown.
[0138] Based on the inventive concept of an environmental protection construction method in the foregoing embodiment, the present invention also provides an environmental protection construction device, on which a computer program is stored, and when the program is executed by a processor, any of the above-mentioned environmental protection construction methods can be realized. steps of a method.
[0139] Among them, in image 3 In the bus architecture (represented by bus 300 ), bus 300 may include any number of interconnected buses and bridges, bus 300 will include one or more processors represented by processor 302 and various types of memory represented by memory 304 circuits are linked together. The bus 300 may also link...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


