A technology of reservoir area and ice layer, applied in construction, artificial island, water conservancy engineering equipment, etc., can solve problems such as insufficient bearing capacity, inclined bridge pier, fatigue damage, etc., to avoid repetitive operations, reduce safety risks, and avoid water operations. Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0040] A method for changing the displacement of an ice layer in an alpine reservoir area, comprising the following steps:
[0041] Set up a concrete anchor on both sides of the water surface in the reservoir area, and use excavators to backfill and compact the earth around the anchor.
[0042]Fill the floating bucket with sand, and close the bucket cover after filling the sand to ensure that water cannot enter. A fixing ring is arranged on the top of the floating bucket. The number of the fixing rings is two, and the two fixing rings are about the The center of the floating bucket is relatively symmetrical, and the number of wire ropes is two, one of which passes through one of the fixed rings of the floating bucket in turn, and the other wire rope passes through the other fixed ring of the floating bucket in turn to connect and fix the floating bucket, forming an isolated floating. bring;
[0043] When fixing the concrete anchor (or profiled steel anchor) on the wire rope, ...
Embodiment approach
[0046] A fixing device is arranged on the isolation floating belt, that is, a concrete anchor or a profiled steel anchor is arranged on the isolation floating belt, and the distance between two adjacent fixing devices is 50m. Preferably, the fixing device is connected to the isolation floating belt. The belt is connected by a fixed rope, one end of the fixed rope is fixedly connected with the isolation floating belt, and the other end of the fixed rope is fixedly connected with the fixing device to realize the fixing of the isolation floating belt; as a preferred implementation According to the scheme, the fixed rope is a steel wire rope;
[0047] To ensure safety, the diameter of the wire rope should be ≥6mm.
[0048] The concrete anchorage or section steel anchorage is transported to the corresponding position by the pontoon, and is fixedly connected with the isolation flotation belt through the wire rope, and then thrown into the water to realize the fixation of the isolati...