An annular cooler and the technology of the annular cooler, applied in the field of annular coolers, can solve the problems of large volume of receiving chute, high labor intensity, long downtime, etc., simplify the process of replacing the receiving chute and reduce maintenance Labor intensity and the effect of reducing safety risks
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0048] Such as Figure 1-5 As shown, the material receiving chute is under the floor 2, the floor 2 plays the role of fixing the hopper 6 and the dust removal pipe 7, and the material receiving chute is located between the upper smoke hood 5 and the dust removal hood 3, so when the dust removal hood 3 is lifted out and the cutting After the old material receiving chute 4, the old material receiving chute 4 needs to be transported out through the reverse rotation of the annular cooler, and then the new material receiving chute 8 is transported into the annular cooler through the forward rotation of the annular cooler , so as to avoid the collision between the material receiving chute and the upper smoke hood 5 when transporting the material receiving chute, the specific steps are as follows,
[0049] When replacing the material receiving chute, fix the position of the hopper 6, cut the connection between the old material receiving chute 4 and the hopper 6, place the old materia...
Embodiment 2
[0051] As another embodiment of the invention, such as Figure 8 As shown, the material receiving chute is under the floor 2, and the floor 2 plays the role of fixing the hopper 6 and the dust removal pipe 7, and there is only the dust removal cover 3 on one side of the material receiving chute. To rotate and transport the old material receiving chute 4 and the new material receiving chute 8 simultaneously, the specific steps are as follows,
[0052] When replacing the material receiving chute, fix the position of the hopper 6, cut the connection between the old material receiving chute 4 and the hopper 6, place the old material receiving chute 4 in the trolley 1 of the annular cooler directly below, and at the same time place the new material receiving chute 8 Placed in the external annular cooler trolley 1, start the annular cooler to rotate in reverse, the annular cooler trolley 1 transports the old material receiving chute 4 out of the outside, while the new material recei...