[0028] A collapsible paint applicator brush for building construction, such as figure 1 , figure 2 , image 3 , Figure 6 , Figure 7 , Figure 8 and Figure 9 As shown, it includes a portable frame 1, a connecting frame 2, a folding mechanism 3 and a smearing mechanism 4, a folding mechanism 3 is installed on the right end of the portable frame 1, a connecting frame 2 is connected to the folding mechanism 3, and a smearing mechanism 4 is installed on the connecting frame 2 .
[0029] The folding mechanism 3 includes a first folding rod 31 , a second folding rod 32 , a third folding rod 33 , a first clamping post 36 , a second clamping post 37 , a first limit spring 38 and a second limit spring 39 , the right end of the portable frame 1 is connected with a first folding rod 31, a second folding rod 32 is slidably provided in the first folding rod 31, a third folding rod 33 is slidably provided in the second folding rod 32, and a third folding rod 33 is provided in a sli...
Embodiment 2
[0033] On the basis of Example 1, such as figure 1 , Figure 4 , Figure 5 and Figure 10 As shown, an anti-splash mechanism 5 is also included, and the anti-splash mechanism 5 includes a mounting frame 51, a first mounting shaft 52, a first connecting rod 53, a second connecting rod 54, a second mounting shaft 55 and an anti-splash baffle 56 , the outside of the connecting circular plate 41 is connected with a mounting frame 51, the inside of the mounting frame 51 is connected with a first mounting shaft 52, and the two first mounting shafts 52 are rotatably connected with a first connecting rod 53, and the first connecting rod 53 There is damping between the first installation shaft 52 and the bottom of the two first connecting rods 53 are connected to the second connecting rod 54 in a rotational manner, there is damping between the second connecting rod 54 and the first connecting rod 53, and the two second connecting rods Both connecting rods 54 are connected with secon...