Efficient rubber plastifying device
A rubber and high-efficiency technology, which is applied in the field of high-efficiency rubber plasticating equipment, can solve the problems of inability to quantitatively control the rubber feeding and the influence of plasticizing effect, and achieve the effect of improving plasticizing efficiency, uniform size, and favorable plasticizing
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0028] like Figure 1-5 As shown, a high-efficiency rubber plasticating device, including
[0029] A box body 1, the top of the box body 1 is fixedly connected with a crushing box 2, and two sets of rotating shafts 4 are installed in rotation inside the box body 2, and crushing rollers 3 are fixedly installed on the outer sides of the two sets of rotating shafts 4, and the two sets of One end of the rotating shaft 4 runs through the side wall of the crushing box 2 and is fixedly equipped with a sprocket 5, and the two groups of sprockets 5 are connected by a transmission chain 32, and the side wall of the crushing box 2 opposite to the sprocket 5 is fixed. A motor 14 is installed, wherein one group of said rotating shafts 4 penetrates the side wall of the crushing box 2 and is fixedly connected with the output shaft of the motor 14;
[0030] The top of the box body 1 is rotatably equipped with a transmission shaft 7, and the top of the box body 1 is provided with several grou...
Embodiment 2
[0038] like figure 1 and Image 6 as shown,
[0039] Described material guiding device comprises deflector 31 and deflector 28, and described deflector 31 is arranged on the upper side of fixed roller 15, and described deflector 28 is arranged on the upper side of moving roller 16, and one end is connected with box body 1. The inner wall is hinged, and the inner wall of the box body 1 is fixedly connected with a fixed plate 26. The upper side of the fixed plate 26 is provided with a chute 2601, and the second threaded rod 30 is installed in the chute 2601 for rotation. The chute 2601 The inner slide is connected with a moving block 27, and the moving block 27 is threadedly connected with the second threaded rod 30. The middle part of the deflector 28 is hinged with a connecting rod 29, and the connecting rod 29 is away from the end of the deflecting plate 28 and moves Block 27 is pivotally connected.
[0040] One end of the second threaded rod 30 penetrates the side wall of...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


