[0034] Attached to the following Figure 1-5 The present invention will be described in further detail.
[0035] The embodiment of the present invention discloses a concrete pouring construction method in which the building floor slabs are constructed in a lag and synchronous construction on the same floor. refer to figure 1 and Figure 5 , a concrete pouring construction method for lag and synchronous construction on the same floor of a house building, comprising the following steps:
[0036] S1: Binding the reinforcement bar 2 of the wall on the N+1th layer: Binding and fixing the reinforcement bar 2 of the wall on the Nth layer to the upper end of the wall reinforcement bar 2 on the N-1st layer;
[0037] S2: Installation formwork: Hang the wall formwork 1 on the inner and outer sides of the wall on the N-1th floor at the same time to the reinforcement bars 2 on the N+1th floor and pull and fix it. During the hoisting process, the N-1th floor The inner side of the wall f...