A production process and a technology of binding ropes, which are applied in the field of binding ropes, can solve problems affecting the combination of raw materials such as compactness, inability to recycle and reuse, and affecting the structural performance of ropes, so as to facilitate processing and production, facilitate deployment and use, and facilitate popularization Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0050] One kind tied belay production process, said bundle belay made of the following material: PET material 44%, 30% recycled material, 8% of glass fiber, polyethylene, 3%, 6% montmorillonite, 1% coupling agent and acetic acid 8% ethyl;
[0051] The tied belay production process comprising the steps of:
[0052] P1, in accordance with the percentage of each ingredient was weighed amount;
[0053] P2, the recovered material into the water to soak for 4-5 hours, taken out after rinsing, and then dried to obtain a dried recycled material;
[0054] P3, recovery of the dried material was crushed, sieved material to form granules;
[0055]P4, the PET material and the particulate material into a vacuum mixer at 45 revolutions per minute to 60 revolutions per minute rate, uniformly stirred 30-40 minutes, and the negative pressure is evacuated to remove other volatile impurities, inclusions, forming a mixed material;
[0056] P5, the mixed molten material into the machine, heated to a mo...
Embodiment 2
[0071] One kind tied belay production process, said bundle belay made of the following material: PET material 47%, 25% recycled material, 5% glass fiber, polyethylene, 4%, 6% montmorillonite, 3% coupling agent and acetic acid 10% ethyl;
[0072] The tied belay production process comprising the steps of:
[0073] P1, in accordance with the percentage of each ingredient was weighed amount;
[0074] P2, the recovered material into the water to soak for 4-5 hours, taken out after rinsing, and then dried to obtain a dried recycled material;
[0075] P3, recovery of the dried material was crushed, sieved material to form granules;
[0076] P4, the PET material and the particulate material into a vacuum mixer at 45 revolutions per minute to 60 revolutions per minute rate, uniformly stirred 30-40 minutes, and the negative pressure is evacuated to remove other volatile impurities, inclusions, forming a mixed material;
[0077] P5, the mixed molten material into the machine, heated to a mol...
Embodiment 3
[0092] One kind tied belay production process, said bundle belay made of the following material: PET material 50%, 22% recycled material, 6% glass fibers, polyethylene, 6%, 6% montmorillonite, acid coupling agent, and 2% 8% ethyl;
[0093] The tied belay production process comprising the steps of:
[0094] P1, in accordance with the percentage of each ingredient was weighed amount;
[0095] P2, the recovered material into the water to soak for 4-5 hours, taken out after rinsing, and then dried to obtain a dried recycled material;
[0096] P3, recovery of the dried material was crushed, sieved material to form granules;
[0097] P4, the PET material and the particulate material into a vacuum mixer at 45 revolutions per minute to 60 revolutions per minute rate, uniformly stirred 30-40 minutes, and the negative pressure is evacuated to remove other volatile impurities, inclusions, forming a mixed material;
[0098] P5, the mixed molten material into the machine, heated to a molten st...