A high-speed train intelligent dispatching control method and system
A technology of intelligent scheduling and control methods, applied in neural learning methods, data processing applications, prediction and other directions, can solve problems such as train conflicts, and achieve the effect of solving train delays, shortening delay time, and improving travel experience
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0034] figure 1 A scene of dense train operation in the station is described when there is a delay. At this time, train k 1 can only choose to drive into the left front section ii, and k 2 have to wait k 1 Only after leaving section i can we continue to move forward. In addition, although section iii is free at this time, k 5 have to wait k 6 Drive through section iii first, otherwise it will cause deadlock. It can be seen that when train delays lead to intensive train operation in the station, the complexity of train scheduling will increase significantly. appears as figure 1 In the case shown, the scheduling adjustment can not only consider the occupancy of adjacent sections and directly dispatch trains, but also needs to consider the mutual influence of multiple trains on the surrounding sections. If this process is only controlled by manual scheduling based on experience, it is difficult to ensure efficiency, and it is not easy to directly find out the optimal sche...
Embodiment 2
[0099] Such as Figure 8 As shown, this embodiment shows a high-speed train intelligent dispatching control system, which specifically includes:
[0100] The historical operation data acquisition and storage module M1 is used to acquire and store the historical operation data of the train; specifically includes:
[0101] The actual performance operation information acquisition unit M1-1 is used to obtain the actual performance operation information of the train by using the train operation management dispatching subsystem;
[0102] The historical operation data acquisition unit M1-2 is used to classify and process the actual performance operation information into four parts, namely (S k , A i ,R,S k '), and store it to obtain the historical operation data;
[0103] Among them, (S k , A i ,R,S k ') indicates that train k is in the current state S k Execute the scheduling action A issued by the dispatcher i Then enter the next state S k ’ and get a return value R, S k...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 