500kV offshore booster station
An offshore step-up station and medium-voltage technology, applied in the field of offshore wind power generation, can solve the problems of high economic cost and limited 220kV submarine cable transmission capacity, and achieve the effects of reducing economic cost, increasing transmission capacity, and improving voltage level
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0028] The specific implementation manners of the present invention will be further described in detail below in conjunction with the accompanying drawings and embodiments. The following examples are used to illustrate the present invention, but are not intended to limit the scope of the present invention.
[0029] It should be noted that "before" in the present invention refers to the attached figure 2 - Figure 5 shown in the lower side, "rear" refers to the figure 2 - Figure 5 shown in the upper side, "left" refers to the attached figure 2 - Figure 5 shown on the left, "right" refers to the attached figure 2 - Figure 5 shown on the right.
[0030] Such as figure 1 As shown, a 500kV offshore step-up substation according to the embodiment of the present invention includes a deck 10, a deck 20, a deck 30 and a top deck 40 arranged sequentially from bottom to top, and the deck 10 is set There is a submarine cable bridge 11 for leading the submarine cable 16 to t...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


