Road network maintenance planning method based on maintenance priority ranking
A priority sorting, road network technology, applied in the direction of instruments, data processing applications, forecasting, etc., can solve the scientific and rational use of road network maintenance planning and maintenance priority to affect the decision-making results of road network maintenance, etc., to achieve road network technology level Improvement of sequence, accurate guarantee of road condition prediction results, and reasonable maintenance planning
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0041] figure 1 It is a schematic flow chart of the road network maintenance planning method based on maintenance priority sorting provided by this embodiment, and the method includes:
[0042] Clarify the routes involved in maintenance planning in the road network, divide the routes into road sections, and clarify the basic information of each road section, including road attributes, road age, starting pile number, road surface structure type, bridge-tunnel ratio, road section traffic conditions, and maintenance history , pavement diseases and their causes, technical conditions of pavement, etc.
[0043]For each road section, the sections that have been included in the latest one-year maintenance plan and the bridge and tunnel sections are deducted.
[0044] Further, select maintenance road sections and determine the nature of maintenance. Eliminate the road sections included in the current maintenance plan and the road sections that are still within the maintenance design ...
Embodiment 2
[0048] This embodiment is the maintenance plan for the general national and provincial road network within the scope of a certain city in the next 3 years. The maintenance road sections are divided by each kilometer, and a total of more than 400 road sections are included in the 3-year maintenance plan. The flow chart of its method is as follows: figure 2 As shown, this embodiment further elaborates on the project-level maintenance decision-making, maintenance priority determination, and road surface technical status model in the road network maintenance planning method based on maintenance priority ranking.
[0049] 1. Project-level maintenance decision-making
[0050] According to the "Technical Specifications for Highway Maintenance" and related manuals on provincial road maintenance, according to the actual situation in the region, a method for determining the nature of maintenance that is slightly higher than the provincial and national standards can be formulated, and a...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


