Charge-discharge control device for secondary battery
A charge and discharge control, secondary battery technology, applied in the direction of secondary battery charging/discharging, battery/fuel cell control device, battery circuit device, etc. question
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment approach 1
[0028] use Figure 1 to Figure 5 Embodiments of the charge and discharge control device for the secondary battery described above will be described.
[0029] A charge and discharge control device 1 for a secondary battery 2 (hereinafter referred to as "charge and discharge control device 1") of the present embodiment is mounted on a vehicle. Furthermore, the charge and discharge control device 1 includes a degradation information estimation unit 20 , an input / output area setting unit 30 , and a charge and discharge control unit 50 .
[0030] The degradation information estimation unit 20 estimates degradation information of the secondary battery 2 .
[0031] The input / output region setting unit 30 controls to expand the initial allowable region of the input / output predetermined in the secondary battery 2 based on the estimation result of the degradation information estimating unit 20 .
[0032] The charging / discharging control unit 50 performs control within the expansion al...
Embodiment approach 2
[0064] In Embodiment 1, the input / output area setting unit 30 sets the initial allowable area so that the upper limit value L2 of the allowable area becomes the limit temperature and limit output / input value of the usable range of the secondary battery 2 . Lifting amount of upper limit L1. In this embodiment, if Figure 7 shown, does not have figure 1 The cooling performance control unit 60 shown is equipped with Figure 7 In the illustrated expansion amount setting unit 35 , the expansion amount setting unit 35 sets the expansion amount of the expansion allowable area set by the input / output area setting unit 30 based on the degradation information acquired by the degradation information estimation unit 20 . In addition, in this Embodiment 2, if Figure 7 shown, does not have figure 1 The operation input unit 40 is shown. The other constituent elements are the same as those in Embodiment 1, and in this embodiment, the same symbols as in Embodiment 1 are used and descript...