Water supply pipe network node water demand checking method coupled with pressure prior information
A priori information, water supply network technology, applied in general water supply conservation, instrumentation, electrical and digital data processing, etc., can solve problems such as inaccuracy and difficult to accurately quantify, improve the calibration accuracy, and avoid the deterioration of algorithm performance. , the effect of improving utilization efficiency
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0016] The purpose of the present invention is to provide a water supply pipe network node water demand checking method coupled with pressure prior information. The prior information of nodal pressure is modeled with uniform probability distribution to describe the boundary constraints of nodal pressure; the data assimilation framework is used to check the nodal water demand by combining the prior information of pressure and other information (such as observation data). The invention has significant potential for improving the accuracy of water supply network modeling.
[0017] The specific embodiments of the present invention will be further described in detail below in conjunction with the accompanying drawings.
[0018] For a water supply network, there are n nodes in total, the number of monitoring points is m, and the number of nodes with known pressure prior information is s. The water supply pipe network node water demand checking method coupled with pressure prior inf...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


