Comprehensive construction system and method for mechanical slurry balance pipe-jacking tunnel to penetrate through existing structure downwards
A mud-water balance and structure technology, applied in tunnels, tunnel linings, underground chambers, etc., to achieve good stability, avoid collapse, and avoid unsafe accidents.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0036] This embodiment provides a comprehensive construction system for a mechanical mud-water balance pipe jacking tunnel passing through existing structures, including a pipe jacking construction system, a comprehensive support monitoring system, and an existing structure protection system; the pipe jacking construction system includes Working well 1, back seat wall 2, hydraulic jack 3, jacking structure support unit 4, roof unit 5, pipeline 6, closed mud-water balance machine head pipe 7 and laser reflection unit; the comprehensive support monitoring system includes the starting port Support 8 and segment stress-strain acquisition unit 9; the originating port support 8 includes a square concrete structure 8.1 and a support base 8.2; diameter of the circular channel; the bottom of the support base 8.2 is supported on the foundation of the starting working well 1, and the top is supported on the bottom surface of the square concrete structure 8.1; the segment stress and strain...
Embodiment 2
[0051] This embodiment is a comprehensive construction method for mechanical mud-water balance pipe jacking tunnel passing through existing structures. The comprehensive construction system of mechanical mud-water balance pipe jacking tunnel passing under existing structures described in Example 1 is constructed. Prospecting the local geological structure, judging the soil quality and construction conditions of the construction site that needs to be used for construction, and mastering the location of existing structures and the deformation limit they can resist in detail. The construction method includes the following steps,
[0052] S1, distinguish whether grouting construction can be carried out inside the existing structure, if grouting construction can be carried out, then carry out grouting reinforcement inside the existing structure; if grouting construction cannot be carried out inside the existing structure, then during the pipe jacking construction Inject grout from t...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More - R&D
- Intellectual Property
- Life Sciences
- Materials
- Tech Scout
- Unparalleled Data Quality
- Higher Quality Content
- 60% Fewer Hallucinations
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2025 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com



