A technology of industrial parks and dispatching methods, applied in the energy industry, circuit devices, sustainable manufacturing/processing, etc., can solve the problem of neglecting the load characteristics of the user side, and the dispatching scheme is difficult to fully utilize the multi-energy complementarity and flexible regulation of the comprehensive energy system Economical and efficient energy use, ignoring issues such as high-efficiency comprehensive energy supply structure design, to achieve the effect of improving energy comfort, energy efficiency, and economic efficiency
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0062] The invention provides a day-ahead scheduling method for energy sources in industrial parks, such as figure 1 shown, including:
[0063] Step 1. Obtain the forecasted operation data set of electric vehicles in the industrial park based on the historical operating data of electric vehicles in the industrial park;
[0064]Step 2. Based on the Euclidean distance between every two predicted operation data sets of electric vehicles in the industrial park, perform data reduction on the predicted operation data set of electric vehicles in the industrial park, and obtain the predicted operation of electric vehicles in the industrial park The remaining forecasted operating data in the data set and their corresponding occurrence probabilities;
[0065] Step 3. Based on the remaining predicted operation data in the predicted operation data set of electric vehicles in the industrial park and its corresponding occurrence probability, obtain the energy day-ahead dispatching scheme c...
Embodiment 2
[0135] Based on the same inventive concept, the present invention also provides a day-ahead scheduling device for energy in industrial parks, such as figure 2 shown, including:
[0136] A prediction unit, configured to obtain a forecasted operation data set of electric vehicles in the industrial park based on historical operating data of the electric vehicles in the industrial park;
[0137] The first acquisition unit is used to perform data reduction on the predicted operation data set of electric vehicles in the industrial park based on the Euclidean distance between every two predicted operation data sets of the electric vehicles in the industrial park, and obtain the electric vehicles in the industrial park. The remaining forecasted operating data in the forecasted operating data set of the car and its corresponding occurrence probability;
[0138] The second acquisition unit is used to obtain the energy day-ahead scheduling plan corresponding to the remaining forecasted...