Strip mine mining plan compilation method and device in annular propulsion mining and stripping mode
A technology for planning and open-pit mines, applied in computing, instrumentation, data processing applications, etc., can solve problems such as relying on manual preparation, and achieve the effect of ensuring enterprise economic benefits and improving rationality
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0100] A1: An open-pit mine contains 3 components. The quality target and quality fluctuation range of each component are shown in Table 1. The mining volume target is 550,000 tons, the mining volume fluctuation range is ±50,000 tons, and the stripping ratio target is 1.3. The mining ratio fluctuation range is ±0.2, the mining stripping volume target of each bench is 100,000 tons, the mining stripping volume fluctuation range of each benching volume is ±50,000 tons, the mining belt width is 40m, the safety platform width is 20m, and the allowed number of simultaneous mining benches is 5.
[0101] Table 1 The quality target and quality fluctuation range of each component
[0102] Target Fluctuation range ingredient 1 0.135 ±0.005 ingredient 2 9.5 ±0.5 ingredient 3 13 ±1
[0103] A2: Advance the starting point position (37543116.09, 3754176.35) according to the status quo of mining.
[0104] A3: The established mathematical model for the ...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


