Unlock instant, AI-driven research and patent intelligence for your innovation.

New energy station abnormal frequency processing method and system under broadband harmonic working condition

A new energy and station technology, applied to harmonic reduction devices, AC networks to reduce harmonics/ripples, wind power generation, etc., can solve the problems of frequency calculation result errors, power fluctuations of new energy stations, and grid-connected points. It achieves the effects of preventing FM misoperation, improving safety and stability, and reducing the number of FM actions

Pending Publication Date: 2022-03-15
CHINA ELECTRIC POWER RES INST +1
View PDF0 Cites 2 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0005] In order to solve the problem that the band-pass filter used in the prior art will lead to large errors in the frequency calculation results under broadband harmonic conditions, which in turn will lead to relatively large power fluctuations in the grid-connected points of new energy stations, the present invention proposes a A method for processing abnormal frequencies of new energy stations under broadband harmonic conditions, including:

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • New energy station abnormal frequency processing method and system under broadband harmonic working condition
  • New energy station abnormal frequency processing method and system under broadband harmonic working condition
  • New energy station abnormal frequency processing method and system under broadband harmonic working condition

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0044] A method for processing abnormal frequencies of new energy stations under broadband harmonic conditions, such as figure 1 shown:

[0045] S1: Collect the instantaneous voltages of the measurement points at different electrical positions of the new energy station;

[0046] S2: take the power frequency as a period, calculate the number of zero-crossing points of the instantaneous voltage, and when the number of zero-crossing points of the voltage is abnormal, calculate the time interval between two adjacent zero-crossing points;

[0047] S3: Determine the blocking and opening of the fast frequency modulation function of the new energy power station based on the time interval between the two adjacent zero-crossing points and the set threshold.

[0048] The present invention provides a method for processing abnormal frequency of a new energy station under broadband harmonic working conditions, comprising:

[0049] In S1, the instantaneous voltage of the measurement points a...

Embodiment 2

[0080] The following is an illustration of a specific case.

[0081] It runs in parallel with the existing fast frequency control strategy of the new energy station, and uses a fixed sampling rate. In this embodiment, 20kHz is used to collect the instantaneous voltage U of the grid connection point of the new energy station. H , the instantaneous voltage U of the 35kV bus in the station M and the instantaneous voltage U on the outlet side of the power generation unit (wind turbine / photovoltaic inverter) L , and the collected instantaneous voltage U of the grid-connected point H , the instantaneous voltage U of the 35kV bus in the station M and the instantaneous voltage U on the outlet side of the power generation unit (wind turbine / photovoltaic inverter) L It is stored in the fast frequency modulation controller of the wind farm for backup;

[0082] Taking the power frequency period as the period, in this embodiment, taking 0.2s as the power frequency period, calculate the...

Embodiment 3

[0089] The present invention based on the same inventive concept also provides an abnormal frequency processing system for a new energy station under broadband harmonic conditions, including:

[0090] The acquisition module is used to collect the instantaneous voltage of the measurement points at different electrical positions of the new energy station;

[0091] a calculation module, used for calculating the number of zero-crossing points of the instantaneous voltage with the power frequency frequency as a period, and calculating the time interval between two adjacent zero-crossing points when the number of zero-crossing points of the voltage is abnormal;

[0092] The regulation module is configured to determine the blocking and opening of the fast frequency regulation function of the new energy station based on the time interval between the two adjacent zero-crossing points and the set threshold.

[0093] The control module includes:

[0094] A temporary blocking sub-module,...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention provides a new energy station abnormal frequency processing method and system under a broadband harmonic working condition. The method comprises the following steps: collecting instantaneous voltages of different electrical position measurement points of a new energy station; calculating the number of the instantaneous voltage zero crossing points by taking the power frequency as a period, and calculating a time interval between two adjacent zero crossing points when the number of the voltage zero crossing points is abnormal; and determining whether to lock the rapid frequency modulation function of the new energy station based on the time interval between the two adjacent zero crossing points and a set threshold value. Whether the rapid frequency modulation function of the new energy station is locked or not is rapidly judged according to whether the number of zero crossing points in the power frequency period is abnormal or not and the time interval between two zero crossing points, misoperation of the frequency modulation device is effectively prevented, the frequency modulation action times of the new energy station are reduced, and the frequency modulation efficiency is improved. The safety and stability of a power grid and the economy of a power generation unit / energy storage device in a station are improved.

Description

technical field [0001] The invention relates to the field of new energy access and control, in particular to a method and system for processing abnormal frequencies of new energy stations under broadband harmonic conditions. Background technique [0002] With the proposal of the major strategic goal of "carbon peaking and carbon neutrality", a large number of wind farms and photovoltaic power stations (hereinafter referred to as new energy stations) will be integrated into the power grid for a long time in the future, and new energy will gradually become the main force. power supply. The power generation unit of the new energy station is connected to the power grid through power electronic devices, and the characteristics of low inertia, weak support, and broadband harmonics will be further highlighted, which requires the new energy station to take active measures to overcome the existing adverse effects, such as actively participating in the power System frequency adjustme...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): H02J3/01H02J3/24H02J3/38H02J3/46
CPCH02J3/01H02J3/241H02J3/38H02J3/46Y02E10/56Y02E10/76Y02E40/40
Inventor 樊熠秦世耀李少林曲春辉张梅贺敬李春彦苗风麟杨宁宁刘厦
Owner CHINA ELECTRIC POWER RES INST