Production process of building asphalt waterproof coiled material
A waterproof membrane and production process technology, applied in applications, household appliances, textiles and papermaking, etc., can solve the problems of slow filming time, poor neatness, large volume, etc., to reduce the size of equipment, solve excessively large, reduce The effect of manufacturing cost
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0032] The present invention will be further described below in combination with specific embodiments.
[0033] According to the indication figure 1 Provided is a construction bituminous waterproof membrane production process, comprising the following steps:
[0034] The first step is to process asphalt raw materials to obtain finished asphalt products;
[0035]In the second step, the carcass in the coil is processed to obtain the base fabric of the coil;
[0036] The third step is to put the base fabric of the coil into the oil immersion tank so that both sides of the base fabric of the coil are evenly coated with asphalt;
[0037] The fourth step is to preliminarily shape the asphalt-stained material base cloth by rolling;
[0038] The fifth step is to cool the waterproof membrane through air cooling or water cooling for further shaping;
[0039] The sixth step is to stick the coiled material through the laminating mechanism to prevent the asphalt from sticking when the ...