Unlock instant, AI-driven research and patent intelligence for your innovation.

Construction method for centralized processing and distribution of reinforcing steel bars based on lean management

A construction method and reinforcement technology, applied in office automation, data processing applications, construction materials processing, etc., can solve the problems affecting the construction period and construction progress, waste of resources, difficult management, etc., and achieve lean management and timely supply. , the effect of reducing the difficulty of management

Pending Publication Date: 2022-04-08
CHINA CONSTR EIGHTH ENG DIV
View PDF6 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0005] In order to solve the technical problems of waste of resources caused by the above extensive management mode, difficult management, and influence on the construction period and construction progress, the present invention provides a construction method based on lean management for centralized processing and distribution of steel bars

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Construction method for centralized processing and distribution of reinforcing steel bars based on lean management
  • Construction method for centralized processing and distribution of reinforcing steel bars based on lean management
  • Construction method for centralized processing and distribution of reinforcing steel bars based on lean management

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0038] The invention discloses a construction method for centralized processing and distribution of steel bars based on lean management, such as figure 1 As shown, a construction method for centralized processing and distribution of steel bars based on lean management includes the following steps;

[0039] Step A, carry out rebar sample; rebar reaming is an important part of rebar management, through rebar reaming can accurately reflect the optimization items of rebar, and it is also a necessary part of rebar processing.

[0040] Use BIM's rebar resampling technology to resample each rebar construction site on the construction site, including special-shaped components and special reinforcement parts on the construction site. The BIM rebar resample technology is developed based on Shanwei Entity Jupiter with Revit as the carrier. Plug-in for rebar flipping under certain conditions; Open the built 3D structural model in Revit software and connect it to the CAD structural drawing...

Embodiment 2

[0056] Compared with embodiment 1, this embodiment discloses a vehicle-mounted system for intelligent transportation, such as figure 2 and image 3 As shown, the intelligent transportation vehicle system includes a processor module, a power supply module, a positioning monitoring module, a communication module, a cloud storage module and a mobile terminal module; the processor module is connected to the power supply module, the positioning monitoring module and the communication module respectively, and the The communication module is connected to the cloud storage module and the mobile terminal module.

[0057] The communication module includes a bluetooth module and a 4G communication module, the bluetooth module is connected to the mobile terminal module, the 4G communication module is connected to the mobile phone terminal through the cloud storage module, and the dual connection mode of the bluetooth connection and the 4G communication mode is used to adapt to different ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a construction method for centralized processing and distribution of reinforcing steel bars based on lean management, and relates to the technical field of building construction. Steel bar sample turning; checking the steel bar material list to form qualified material list disclosure; constructing a steel bar processing factory, and introducing numerical control processing equipment; communicating and transmitting steel bar material list disclosure data; formulating a reinforcing steel bar processing distribution system, and intensively processing reinforcing steel bars; steel bar distribution identification; according to the construction method, the management loss of the steel bar materials in the machining process is reduced, steel bar waste is avoided, the management difficulty is reduced in the aspects of quality control and safety management, timely machining and distribution of the steel bars are guaranteed, and the construction period and the construction progress are prevented from being affected.

Description

technical field [0001] The invention relates to the technical field of building construction, in particular to a construction method for centralized processing and distribution of steel bars based on lean management. Background technique [0002] With the continuous development of the country, the demand for buildings continues to expand, and the volume of buildings is also increasing. Generally, a project comes from a group project composed of multiple monomers, and the project area is often hundreds of thousands of square meters or even Hundreds of thousands of square feet. Some high requirements are put forward for the molding speed of the building, and the quality of the project must be guaranteed while requiring fast speed, which puts forward higher requirements for the project supervisor. [0003] At present, the building is basically formed gradually by the method of concrete filling. Before the concrete filling, the steel cage should be laid and bound according to t...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): E04G21/00G06F30/13G06Q10/08G06Q10/10G06Q50/30
Inventor 闫磊刁伟姚一凤种浩然金雷鸣张红显
Owner CHINA CONSTR EIGHTH ENG DIV