Combined type casing pipe in pipeline dense area and construction method of combined type casing pipe
A construction method and technology in dense areas, applied in geometric CAD, architecture, building structure, etc., can solve the problem of large vertical position deviation of floor casings, hidden dangers of ordinary directly buried steel casings, and difficulty in installation of floor casings major problems, to avoid fire hazards, save manpower and material resources, and achieve good social benefits
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0023] The content of the present invention will be further described in detail below in conjunction with the accompanying drawings.
[0024] Taking the installation project of Xi'an Children's Hospital Economic Development Zone as an example, its water supply and drainage, fire protection and medical pipelines are dense and intricate, with a tight construction period and a large amount of reserved pre-embedded volume.
[0025] The present invention provides a combined casing in a pipeline-intensive area, which includes a casing 1, the outer wall of the casing 1 is provided with a chute 101, and a plurality of chute 101 is provided along the circumference of the casing 1. Two adjacent chutes 101 have a circumferential interval of 90 degrees or 180 degrees; a connecting rod 102 is arranged in the chute 101, and the connecting rod 102 and the chute 101 can be fixed together by a locking nut 103; the casing 1 is provided with multiple, And according to the circumferential positio...