A technology of building exterior walls and construction methods, which is applied in the direction of building structure, construction, and building materials processing, can solve the problems of slow construction process, low horizontal and vertical positioning accuracy of exterior walls, etc., and achieve faster construction efficiency and obvious social Benefits and economic benefits, the effect of shortening the construction period
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0041] The embodiment of the present invention discloses a construction method for the exterior wall structure of a prefabricated building, refer to figure 1 , including the following construction steps:
[0042] Step 1: Clean up the installation joint surface of the prefabricated outer wall 5 and the installed components, carry out positioning and lay-out on the installation joint surface of the installed components, measure and mark the positioning edge of the prefabricated outer wall 5, use 2 steel bar clamps to The reserved steel bars 11 of the installation components are positioned and checked;
[0043] Step 2: Use the reserved holes 21 on the steel bar fixture 2 to spread the slurry, so that the base surface of the installation joint surface forms a table shape with a convex middle and a concave on both sides;
[0044] Step 3: Install the prefabricated outer wall 5 on the base surface of the installation joint surface, hoist the prefabricated outer wall 5 to the base su...
Embodiment 2
[0050] On the basis of Example 1, increase:
[0051] The cleaning of the installation joint surface includes cleaning oil stains, floating ash and loose concrete blocks, and after the cleaning is completed, the installation joint surface is subjected to water spraying and wetting treatment.
[0052] refer to figure 2 , the two sides between the steel bar clamp 2 and the installed member are padded with square wood 3, the installed member includes a concrete beam 1, and the steel bar clamp 2 passes through the mountain-shaped clamp 4 and the tension bolt 41 is installed in a tight fit with the concrete beam, and the position of the mountain-shaped fixture 4 is adjusted by the bottom positioning rod 42 .
[0053] Before the laser leveler detects the elevation and verticality of the prefabricated outer wall 5, it first marks the fixed height control line on the prefabricated outer wall 5, and adjusts the elevation line of the laser leveler and the fixed height control on the pr...
Embodiment 3
[0058] On the basis of Example 2, increase:
[0059] The installation density of the diagonal braces 6 is determined according to the width of the prefabricated outer wall 5 . If the prefabricated outer wall 5 is wider than 4 meters, use 3-5 diagonal braces 6 , and use 4-6 diagonal braces 6 if the width of the prefabricated outer wall 5 is greater than 6 meters.
[0060] A BIM simulation model is established based on the position information and specification information of the prefabricated outer wall 5, the installation process is simulated, and the structural conflict during installation is checked.
[0061] After the installation of the prefabricated outer wall 5 is completed, the reinforcement bars are bound at the post-casting belt and concrete is poured at the post-casting belt.