Thin coated steel concrete combination column on-site splicing structure and splicing construction method thereof
A construction method and technology of combining columns, applied in the directions of columns, pillars, piers, etc., can solve the problems of high construction cost, a small amount of fire prevention and anti-corrosion treatment, complex on-site treatment of nodes, etc., and achieve the effect of improving construction efficiency and reducing construction difficulty.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0034] see Figure 1 to Figure 3 The present invention provides an on-site splicing structure of thin-coated steel concrete composite columns with better economic benefits and easier installation. The technical solution provides an assembled splicing node for composite columns; It is made by assembling or welding multiple sections of columns, and the technical concept of the prefabricated type is to leave the complex process in the factory for prefabrication and leave the simple process to the site, so it is possible to improve the efficiency of on-site construction, and the factory can be machined production, and it is more economical Energy saving. To this end, the splicing structure includes at least two H-shaped steels 1 , the sides of the H-shaped steels 1 are filled with thin clad concrete 11 , the rear end of the H-shaped steel 1 is provided with a first end plate 21 , and the head end is provided with a first end plate 21 . The second end plate 23, a rear cladding spa...
Embodiment 2
[0047] The present invention also provides a method for assembling the above-mentioned thin-coated steel concrete composite column on-site splicing structure, which includes two main steps, one is a prefabrication step in a factory, and the other is a construction step on the construction site. Here, the two steps of prefabrication and on-site installation only take the entire process of two H-beams 1 as detailed descriptions. As for how many H-beams 1 are required for on-site construction, it is only necessary to prefabricate the corresponding number of prefabricated columns according to S1, and then repeat S2 on-site installation. on-site installation steps. specific:
[0048] S1 Prefab:
[0049] A first end plate 21 and a second end plate 23 are welded to the tail end and the head end of the H-beam 1 respectively, and a first splicing hole 211 for splicing is opened in the first end plate 21, and the second end plate 23 A second splicing hole 231 for splicing is opened; a...