Anti-icing system for water conservancy and hydropower engineering
An anti-icing system, water conservancy and hydropower technology, applied in water conservancy projects, water conservancy engineering equipment, hydropower generation and other directions, can solve the problems of inconvenient maintenance, high use cost, and reduced practical performance.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
no. 1 example
[0036] Please refer to figure 1 , figure 2 , image 3 , Figure 4 ,in, figure 1 It is a schematic structural diagram of the first embodiment of a water conservancy and hydropower engineering ice protection system provided by the present invention; figure 2 for figure 1 Schematic diagram of the structure of the pull-back impact device shown; image 3 for figure 1 The schematic diagram of the external three-dimensional structure of the photovoltaic module shown; Figure 4 for figure 1 Shown is a schematic diagram of the external three-dimensional structure of the fixed frame. An anti-icing system for water conservancy and hydropower projects, comprising: a fixing frame 1;
[0037] A moving structure 4, the moving structure 4 is fixedly installed on the front and back inside the fixed frame 1;
[0038] Fixed column 5, the fixed column 5 is fixedly installed on the inner side of the moving structure 4, the surface of the fixed column 5 is slidably connected with a holl...
no. 2 example
[0057] Please refer to Figure 5 and Image 6 , based on an anti-icing system for a water conservancy and hydropower project provided by the first embodiment of the present application, another anti-icing system for a water conservancy and hydropower project is proposed in the second embodiment of the present application. The second embodiment is only a preferred mode of the first embodiment, and the implementation of the second embodiment will not affect the independent implementation of the first embodiment.
[0058] Specifically, the anti-icing system for water conservancy and hydropower engineering provided by the second embodiment of the present application is different in that, in an anti-icing system for water conservancy and hydropower engineering, the bottom of the photovoltaic module 11 is provided with a mounting seat 13 , and the A mounting plate 14 is rotatably connected to the top of the mounting seat 13 , a second motor 15 is fixedly mounted on the bottom of th...
no. 3 example
[0071] Please refer to Figure 7 , based on an anti-icing system for a water conservancy and hydropower project provided in the first embodiment of the present application, another anti-icing system for a water conservancy and hydropower project is proposed in the third embodiment of the present application. The third embodiment is only a preferred mode of the first embodiment, and the implementation of the third embodiment will not affect the independent implementation of the first embodiment.
[0072] Specifically, the difference between the anti-icing system for water conservancy and hydropower engineering provided by the third embodiment of the present application is that, in the anti-icing system for water conservancy and hydropower engineering, the top of the eccentric wheel 8 is fixedly connected with a mounting block 25, so the The top of the installation block 25 is provided with an insertion hole 26 , the two sides of the inside of the installation block 25 and the o...
PUM

Abstract
Description
Claims
Application Information

- R&D
- Intellectual Property
- Life Sciences
- Materials
- Tech Scout
- Unparalleled Data Quality
- Higher Quality Content
- 60% Fewer Hallucinations
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2025 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com