Method for preventing well wall fracture through active protection blocking ring
An active protection, well wall technology, applied in drilling equipment and methods, earthwork drilling, shaft equipment and other directions, can solve the problems of short duration of treatment effect, multiple damage of shaft shaft, and increased treatment cost, and achieve prevention and control. The effect of controlling the fracture of the shaft wall, improving the stress condition of the shaft wall and reducing the strength of passive support
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0028] The present invention will be further described below with reference to the accompanying drawings and specific embodiments.
[0029] like Figure 1-Figure 4 As shown, a method for preventing and controlling well wall rupture through active protection blocking ring of the present invention comprises the following steps:
[0030]Step 1: According to the actual situation and site conditions, determine the position of the mine shaft shaft 1 that needs to implement the active protection blocking ring 2, and pre-mark the construction of the active protection blocking ring 2 around the mine shaft shaft 1, that is, in the mine The position of the top of the active protection blocking ring 2 is marked around the shaft shaft 1; the thickness of the rock and soil stratum left between the active protection blocking ring 2 and the mine shaft shaft 1 is not more than 30 meters, that is, the edge of the mine shaft shaft 1 The straight-line distance from the inside of the active prote...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


