Photovoltaic power plant operation analysis dashboard platform graphical user interface for electronic devices
CN310080011SActive Publication Date: 2026-07-10深圳创维光伏智慧能源有限公司
View PDF 0 Cites 0 Cited by
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Designs(China)
- Current Assignee / Owner
- 深圳创维光伏智慧能源有限公司
- Filing Date
- 2025-03-07
- Publication Date
- 2026-07-10
Smart Images

Figure 000002_ABST
Abstract
1. Name of the product in this design: Graphical User Interface for Photovoltaic Power Plant Operation Analysis Dashboard Platform for Electronic Equipment. 2. Intended use of this design: for use in an electronic device. 3. The key design feature of this product is its graphical user interface. 4. The image or photo that best illustrates the design points: Design 1 Interface Change State Diagram 1. 5. Design 1 is designated as the basic design. 6. Applications of the graphical user interface: Real-time data monitoring, power generation efficiency analysis, and construction planning decision support for photovoltaic power plants. 7. Human-computer interaction method of graphical user interface: In Design 1 to Design 4, the main view is the homepage, which displays information such as the provincial map of China, the current date, and eye-shaped display buttons; In Design 1 to Design 4, the interface change state diagram 1 displays the provincial map of China and related power plant power generation data, including the power generation of power plants nationwide, power generation trends, power generation completion status, key areas of concern, number of power plants built in each year, power plant product categories, power plant capacity distribution range, and other module information. Click the eye-shaped display button in the upper right corner of the main view of Design 1 to enter the Design 1 interface change state diagram 1. In the Design 1 interface change state diagram 1, click or hover the mouse over the corresponding line chart area under the "Power Generation Trend" module to enter the Design 1 interface change state diagram 2, which displays the power generation data information corresponding to that area. Click the eye-shaped display button in the upper right corner of the Design 2 main view to enter the Design 2 interface change state diagram 1. In the Design 2 interface change state diagram 1, click or hover the mouse over the corresponding bar chart area under the "Power Generation Completion Status" module to enter the Design 2 interface change state diagram 2, which displays the power generation completion rate data information corresponding to that area. Click the eye-shaped display button in the upper right corner of the Design 3 main view to enter the Design 3 interface change state diagram 1. In the Design 3 interface change state diagram 1, click or hover the mouse over the corresponding bar chart area under the "Number of Websites Built in Each Year" module to enter the Design 3 interface change state diagram 2, which displays the website building data information corresponding to that area. Click the eye-shaped display button in the upper right corner of the Design 4 main view to enter the Design 4 interface change state diagram 1. In the Design 4 interface change state diagram 1, click or hover the mouse over the corresponding circular chart area under the "Power Plant Product Category" module to enter the Design 4 interface change state diagram 2, which displays the power plant products and their data information corresponding to that area. 8. Other situations requiring explanation: Other explanation: "X" in the interface represents content areas such as text, numbers, or symbols.
Need to check novelty before this filing date? Find Prior Art