METHOD AND COMPUTER PROGRAM PRODUCT FOR THE MAINTENANCE OF COMMERCIAL AIRCRAFT
Patent Information
- Application Number
- DE502020013675
- Authority / Receiving Office
- DE · DE
- Patent Type
- Patents
- Current Assignee / Owner
- Priority Date
- 2019-11-26
- Filing Date
- 2020-11-25
- Publication Date
- 2026-11-05
- Estimated Expiration
- 2040-11-25
AI Technical Summary
Current maintenance planning for commercial aircraft is often manually adjusted and suboptimal, especially in response to short-term changes or disruptions, leading to inefficiencies and excess capacity at maintenance stations due to the inability to automate the coordination of maintenance work and aircraft deployment.
A method and computer program product that determine maintenance work requirements, identify suitable maintenance stations, and optimize aircraft routing to ensure timely completion of maintenance tasks with minimal disruption to flight schedules by considering technical data and station capacity.
Ensures that maintenance work is completed on time without altering the flight schedule or aircraft routing, optimizing the use of maintenance stations and personnel, and reducing the need for excess capacity.
Description
[0001] The invention relates to a method for the maintenance of commercial aircraft and a corresponding computer program product.
[0002] Commercial aircraft used in an air network must undergo regular maintenance to ensure safe operation. This includes not only maintenance work performed according to manufacturer specifications and fixed maintenance intervals, but also troubleshooting error messages generated by the aircraft's onboard computer.
[0003] The necessary work must be carried out on the ground at maintenance stations specifically designed and staffed with appropriate personnel. Maintenance stations are generally only located at selected points within an air network, and each station has its own unique equipment. In other words, not every maintenance station is equipped for all possible repairs.
[0004] During maintenance, the aircraft must be on the ground. Particularly with regard to maintenance work according to the established maintenance intervals, aircraft deployment plans within a flight network include ground time at an airport with a maintenance facility to allow for the execution of the necessary scheduled maintenance. The scheduling, especially the staffing, of the maintenance facilities must be adjusted accordingly to accommodate these ground times.
[0005] The ground time scheduled for regular maintenance, as well as other aircraft downtime, such as overnight, can be planned with a certain buffer to allow for the rectification of unforeseen aircraft malfunctions. Such malfunctions are detected and recorded by the aircraft's onboard computer during operation.
[0006] In current technology, the planning of maintenance work for all aircraft in a fleet at the maintenance stations available in the flight network is often carried out manually, possibly only with the aid of computer tools for the graphical representation of the work to be carried out and the utilization of the maintenance stations, or for detailed planning of complex maintenance work on a single aircraft that requires several maintenance teams and / or a complex sequence of steps.
[0007] Particularly due to short-term changes or disruptions in flight operations, maintenance planning is subject to constant change. This includes not only shifts in ground time for aircraft requiring maintenance, but also any changes to the deployment of a specific aircraft. The maintenance intervals used to plan regular maintenance are typically based on actual flight hours and / or the number of flight cycles. These can change so significantly in the event of an unforeseen change to the flight schedule or the deployment of an aircraft that maintenance must be performed earlier than originally planned. Furthermore, a change to the flight schedule or...The use of an aircraft may result in the aircraft being at a different maintenance station than the originally intended maintenance station during a ground time scheduled for maintenance.
[0008] With current technology, such short-term changes to maintenance planning can only be accommodated manually – and usually under time pressure. The resulting maintenance planning is often less than optimal. Furthermore, some maintenance stations must maintain significant excess capacity to meet potentially sudden increases in maintenance needs and minimize disruptions to the flight schedule due to untimely maintenance completion.
[0009] Document US 2018 / 008226 A1 concerns a procedure for coordinating flight routing and aircraft maintenance planning for a fleet over a given period. In a first iteration, a list of due maintenance tasks, along with the necessary ground times, is used as a constraint for optimizing flight routing within the timeframe to create maintenance opportunities. In a second iteration, the individual maintenance tasks are planned within these identified opportunities.
[0010] Document US 2018 / 0005197 A1 proposes a procedure for planning aircraft maintenance outside of a routine schedule for the replacement of certain parts.
[0011] The object of the present invention is to create a method for the maintenance of commercial aircraft that is improved compared to the prior art, as well as a corresponding computer program product.
[0012] This problem is solved by a method according to the main claim and a computer program product according to claim 11. Advantageous further developments are the subject of the dependent claims.
[0013] Accordingly, the invention relates to a method for carrying out maintenance work on commercial aircraft of a fleet used in an air network, wherein For each aircraft in the fleet: technical data, information on required maintenance work based on maintenance intervals and / or error messages, including deadlines for the completion of individual maintenance tasks, and information on the planned routing of the aircraft within the flight network in a first period, including the aircraft's ground time; for the fleet: a flight schedule for a second period following the first, including the flight routes to be served within the flight network with the technical requirements of each flight route, whereby it is not yet determined which aircraft will actually serve each individual flight route in the second period; for the flight network: the maintenance stations within the flight network, including their technical equipment and capacity; are available, characterized by the steps: Determination of the required maintenance work for at least one aircraft, including the completion dates of the maintenance work; if the completion date of at least one maintenance work for an aircraft falls within the first period: identification of a maintenance station in the air network adequately equipped to carry out the maintenance work during a specific ground time of the aircraft;If the end date of an aircraft maintenance work falls within the second period: Determine at least one time period required to carry out the maintenance work(s) on an aircraft within the second period; determine the routing of all aircraft in the air network, taking into account the technical data of the aircraft and the technical requirements of the individual flight routes, whereby the routing for the aircraft to be serviced specifies a ground time corresponding to the at least one determined time period at a maintenance station adequately equipped to carry out the maintenance work; and carry out the maintenance work on an aircraft at the designated maintenance station within the designated ground time.
[0014] Furthermore, the invention relates to a computer program product comprising program parts which, when loaded into a computer, are designed to carry out the method according to the invention.
[0015] First, some terms used in connection with the invention will be explained.
[0016] A "deadline" for completing individual maintenance tasks refers to the point in time by which maintenance work must be completed, either based on maintenance intervals or due to a fault message. This requirement arises either from manufacturer or certification specifications, which may relate to flight safety, or from other requirements, such as the functioning of passenger amenities, e.g., the in-flight entertainment system. The "deadline" can be specified as a calendar date or in terms of flight hours or flight cycles. For example, for specific maintenance intervals or in response to certain fault messages, it may be stipulated within how many flight hours the corresponding maintenance work must be performed.
[0017] The deployment of commercial aircraft within an air network is governed by a flight schedule, which forms the basis for the so-called "routing" of the aircraft. While the flight schedule merely specifies which connection between two airports within the air network is to be served by a (basically any technically suitable) aircraft at a given time ("flight route"), the routing of an aircraft determines which of the flight routes according to the flight schedule that particular aircraft is to serve sequentially.
[0018] The method according to the invention is characterized in that, when maintenance work is required – regardless of whether it arises due to a fixed maintenance interval or an error message – the necessary maintenance work is determined based on various technical information, which has as little or no negative impact on the operation of the air network as possible.
[0019] According to the invention, the method is carried out using various technical parameters of the air network including maintenance stations, the fleet of aircraft used on the air network, and the individual aircraft.
[0020] Various technical data must be available for each aircraft. This required technical data may include information necessary for creating a flight plan. Besides specifying the payload mass or – more relevant for commercial aircraft – the passenger capacity, possibly divided into individual booking classes, this may include data concerning range, cruising speed, and / or takeoff and landing requirements. This technical data can be used, for example, to ensure that an aircraft can actually operate a specific flight route within the desired flight time, taking into account requirements such as passenger volume, length, and takeoff and landing conditions. For any necessary maintenance work, data about the aircraft is preferably available, specifying the aircraft type and the various options available for the aircraft, such as...Engine options, interior fittings, etc.
[0021] The information regarding required maintenance work can include not only the completion dates for individual maintenance tasks (which themselves can be considered technical information) but also further technical details. In particular, the technical information can relate to the aircraft components affected by the maintenance work and / or any requirements regarding which aircraft systems may need to be temporarily shut down for maintenance. This information can be used to coordinate various maintenance tasks. For example, if the aircraft's electrical system needs to be completely deactivated temporarily for required maintenance, no other maintenance work requiring a continuous power supply, such as updating computer systems, can be carried out at the same time. Conversely, the technical data can also indicate which maintenance tasks can potentially be performed concurrently.
[0022] For the technical requirements of the individual flight routes within the air network, the aforementioned take-off and landing parameters of the connected airports, as well as the distance between the airports, may be available to ensure that an aircraft intended for a specific flight route can actually take off and land at the connected airports and cover the distance between them without difficulty. The relevant technical information may include the length and / or the permissible ground pressure per landing gear wheel of the airport runways, and, where applicable, their elevation above sea level.
[0023] The technical data for the individual maintenance stations in the flight network primarily relates to the technical equipment of the maintenance stations with regard to the maintenance work that can be carried out there and the aircraft types that can be serviced. The maintenance stations may be located at airports directly included in the flight schedule. However, it is also possible that a maintenance station is located at an airport that is not directly included in the flight schedule routes but is only used by aircraft for maintenance purposes.
[0024] For each maintenance task, a specific timeframe is defined – possibly separately for each maintenance station – which must be allocated for that particular task. This timeframe is generally derived from the technical requirements of the maintenance work and can be determined, in particular, from records of past maintenance.
[0025] The routing of individual aircraft within a fleet is typically determined several days in advance, based on the flight schedule planned for those days. This means that each aircraft is assigned to which flight routes within the schedule. In addition to an aircraft's fundamental technical suitability to actually operate a specific flight route (e.g., regarding passenger capacity and range) and any turnaround times at individual airports, ground time required for maintenance work at specific maintenance stations within the flight network can also be taken into account, if known. Naturally, aircraft known to require extensive maintenance throughout the entire planning period are not considered in the routing calculation until the completion of this maintenance.
[0026] The planning period for the routing is preferably less than 21 days, typically 3 to 7 days. The period for which the routing exists for the individual aircraft of a fleet is the first period according to the invention.
[0027] This first period is followed by the second period, for which the flight schedule already exists – i.e., which routes are to be served at which times – but it is not yet determined which aircraft will actually serve each individual flight route.
[0028] Based on this, the invention is based on the insight that the different planning status regarding the use of aircraft of a fleet in an air network in the first and second periods can be used advantageously for carrying out maintenance work or for determining its timing.
[0029] Maintenance work whose completion date falls within the first period and which must therefore be completed within the existing aircraft routing is scheduled within the aircraft's ground time specified in the routing at technically suitable maintenance stations. Maintenance work that is foreseeable based on predefined maintenance intervals can be directly incorporated into the routing – for example, using the procedure described below. For maintenance work triggered by error messages, a ground time for the aircraft is allocated at short notice to a maintenance station that is technically equipped to perform at least that portion of the required maintenance work, the completion date of which does not allow for later maintenance at another station. The ground time of the aircraft to be serviced, during which the maintenance work is to be carried out, is also determined.
[0030] In addition to ensuring the maintenance station has sufficient technical equipment, its workload during the aircraft's scheduled ground time can also be considered when selecting the maintenance station. If the aircraft's routing allows for multiple possible maintenance stations—meaning several ground times at different airports with technically suitable maintenance stations are planned before the required maintenance work is completed—the station with sufficient capacity can be chosen. To this end, comprehensive information about the scheduled maintenance work for all aircraft at each station, including the planned ground time, is collected and factored into the selection process.
[0031] If none of the potentially suitable maintenance stations has sufficient capacity to assign an aircraft at short notice due to a fault message within the corresponding deadline, it is preferable to postpone maintenance work on other aircraft at the potentially suitable maintenance stations (e.g., to a later ground time, possibly at another maintenance station) that is not absolutely necessary or can be postponed due to the respective deadline, in order to create capacity for the urgently required maintenance work on an aircraft.
[0032] Especially when an aircraft is assigned to a maintenance station at short notice due to a fault message, it is also possible, provided the maintenance station has sufficient capacity, to schedule previously known but not yet scheduled maintenance work (e.g., because the completion date is far in the future) together with the maintenance work required due to the fault message at the same station and then carry it out accordingly. This is, of course, only possible if the maintenance station is adequately equipped and has sufficient capacity for this additional maintenance work. As a rule, only those additional maintenance tasks that can be completed within the scheduled ground time are planned. This ensures that the routing of the aircraft being serviced does not have to be changed.This can avoid further grounding of the aircraft at a maintenance station, at least in some cases.
[0033] The additional maintenance work specified accordingly is regularly of a type that can be postponed if necessary in the event of urgent short-term maintenance of another aircraft (see above).
[0034] By scheduling maintenance within the first period as described above, and in particular any maintenance work required at short notice due to error messages, the method according to the invention ensures that, as a rule, neither the routing nor the flight schedule needs to be changed for the first period. It has been shown that this can be achieved using the method according to the invention at least when no major damage occurs to the aircraft that would, for example, require an immediate grounding of an aircraft.
[0035] If maintenance work is required whose completion date falls within the second period, the method according to the invention provides for the necessary ground time to be taken into account directly during the routing of the individual aircraft in a fleet—that is, the allocation of the aircraft to specific flight routes in the flight plan. Such maintenance work can primarily involve maintenance work specified by maintenance intervals, for which a larger timeframe is often specified as the earliest possible start date and / or the latest possible completion date. Within the scope of the invention, maintenance work is "required" at the first specified time, while the latter represents the completion date for the maintenance work. It is, of course, also possible that the completion date of maintenance work necessitated by a fault message falls within the second period.
[0036] For the necessary maintenance work, information is preferably available regarding its expected duration, the technical requirements for a suitable maintenance station, and, if applicable, information on which other maintenance work can be carried out concurrently on the same aircraft. Based on this information for individual maintenance tasks or groups of concurrently performable maintenance tasks, one or more time periods can be determined that include the required ground time for carrying out one or more maintenance tasks and the technical requirements for a suitable maintenance station.
[0037] The time intervals, preferably defined for all aircraft in a fleet, are taken into account when routing all aircraft in the flight network. In addition to considering the aircraft's technical data and the technical requirements of the individual flight routes, as is known from the prior art, ground time at maintenance stations is allocated for each aircraft according to the previously determined time intervals. This means that the ground time is greater than or equal to the determined time interval and is also allocated to maintenance stations whose technical equipment is sufficient for the maintenance work to be carried out within that time interval. Consequently, it is ensured that all maintenance work arising during the phase for which the routing of the individual aircraft is created can be carried out properly at the designated ground time and at the appropriate maintenance stations.The routing created in this way will, as time progresses and the second period is reached, become the routing of the aircraft in the aircraft network in the first period (see above).
[0038] When creating the routing, and in particular when allocating the ground time required for maintenance work, in addition to comparing the technical requirements, optimization is also carried out with regard to the utilization of the individual maintenance stations in the flight network. This includes ensuring that no maintenance station performs more maintenance work simultaneously than its capacity allows, whereby capacity in this context refers not only to the technical equipment of the maintenance station but also to the availability of maintenance personnel at that station. By balancing the utilization, it is ensured that the maintenance personnel are evenly utilized.At the same time, it is ensured that, as a rule, capacity is available at each of the maintenance stations to carry out short-term maintenance work on aircraft not scheduled for maintenance due to error messages (see above).
[0039] The routing for the second period can preferably be initially based on the routing from the first period. This involves preferably checking whether, when updating the flight plan from the first period, the maintenance work can be carried out at a sufficiently equipped maintenance station within the planned ground time. If so, the routing for all aircraft in the flight network for the second period is updated until the end of the maintenance work from the first period. If updating the flight plan from the first period is fundamentally possible, the otherwise required computing power for creating an alternative routing can be avoided.
[0040] Alternatively or additionally, it is also possible to group individual flight routes into a "rotation," in which consecutive flight routes are flown sequentially by one aircraft. The rotations can begin and end at the same airport or at two different airports. By defining rotations instead of the flight routes grouped within them, the computing power required to generate a routing for all aircraft in the air network for the second period can be regularly reduced.
[0041] Regardless of whether it is determined within the first or second period, the planned maintenance work will be carried out in the designated ground time at the designated maintenance station in accordance with the state of the art.
[0042] As explained, the inventive method, when determining ground times for an aircraft at specific maintenance stations, is based on a multitude of technical parameters that must be considered for both the first and second periods. As a result, not only are the necessary maintenance works carried out before the respective scheduled deadlines, but the flight schedule, in which the various flight routes interlock, is also not disrupted, or at least only minimally so. Due to their high complexity, the necessary steps and adjustments can no longer be performed manually, or at least not within an acceptable timeframe.
[0043] In addition to the required maintenance work based on maintenance intervals or error messages, the method according to the invention can also take into account maintenance work that arises during the execution of other maintenance work or whose necessity is discovered in the process (so-called "findings"). It is also possible to consider maintenance work deemed necessary based on predictive maintenance in the method according to the invention.
[0044] For an explanation of the computer program product according to the invention, reference is made to the preceding statements. It is understood that the final execution of the maintenance work cannot generally be carried out by the computer program product itself, but rather that the process steps that can be represented by the computer program product only extend to the final execution of the maintenance work.
[0045] The invention will now be described by way of example with reference to the accompanying drawings. These show: Figures 1-3a,b: schematic representations of the method according to the invention.
[0046] As a starting point for further explanations of the method according to the invention, in Figure 1In the upper section, the routing for five aircraft FZ1, FZ2, FZ3, FZ4, FZ5 of a fleet is shown within a flight network comprising five airports FH1, FH2, FH3, FH4, FH5. Two of these airports, FH1 and FH2, have maintenance stations WS1.1, WS2.1, and WS2.2. The routing is shown from left to right over an initial period T1. The possible positions of an aircraft FZ1, FZ2, FZ3, FZ4, FZ5 at an airport FH1, FH2, FH3, FH4, FH5 or at a maintenance station WS1.1, WS2.1, WS2.2 are each represented by a horizontal dotted line. The individual lines for aircraft FZ1, FZ2, FZ3, FZ4, FZ5 indicate when each aircraft FZ1, FZ2, FZ3, FZ4, FZ5 is either at a station position FH1, FH2, FH3, FH4, FH5, WS1.1, WS2.1, WS2.2 (see horizontal sections), or when it is en route between stations FH1, FH2, FH3, FH4, FH5, WS1.1, WS2.1, WS2.2 (see horizontal sections).diagonal sections), whether on a flight between two airports FH1, FH2, FH3, FH4, FH5 or taxiing to or from a maintenance station WS1.1, WS2.1, WS2.2. Therefore, the ground times of the individual aircraft FH1, FH2, FH3, FH4, FH5 at the individual airports FH1, FH2, FH3, FH4, FH5 can be directly read from Figure 1.
[0047] In the lower area of the Figure 1 For each of the five aircraft FZ1, FZ2, FZ3, FZ4, FZ5 in the fleet, information on required maintenance 20 according to specified maintenance intervals is displayed over time, whereby each of the maintenance 20 can be postponed if necessary until the respective indicated end date 21.
[0048] The routing of aircraft FZ1, FZ2, FZ3, FZ4, FZ5 is chosen in the first period T1 such that all flight routes of a flight plan (not shown in the first period T1 for clarity) are served.
[0049] As will be shown later using the Figure 3a and b As will be explained in more detail below, the routing according to the inventive method is planned such that the aircraft FZ1, FZ2, FZ3 to be serviced in the first period T1 are located at a maintenance station WS1.1, WS2.1, WS2.2 adequately equipped for carrying out the maintenance during the intended maintenance periods, and in particular before the respective end date 21 for a maintenance 20. Whether a maintenance station is adequately equipped for a maintenance 10 can be determined based on suitable information about the individual maintenance stations WS1.1, WS2.1, WS2.2 with regard to equipment and capacity.
[0050] In the illustrated embodiment, the aircraft FZ1's stay at maintenance station WS1.1 is planned to be longer than necessary for the actually planned maintenance 20, in order to be able to immediately resolve any problems that may arise during the maintenance at maintenance station WS1.1.
[0051] For the second period T2, only the flight plan with the flight routes 10 to be served (see parallel lines) is available, without it yet being determined which of the aircraft FZ1, FZ2, FZ3, FZ4, FZ5 will serve the respective flight routes 10. A portion of the flight routes 10 are grouped into a rotation 11, which means that the flight routes 10 of rotation 11 will be served sequentially by one and the same aircraft FZ1, FZ2, FZ3, FZ4, FZ5. As time progresses after the completion of the first period T1, the second period T2 becomes the new first period T1.
[0052] For all flight routes 10, various technical requirements exist that an aircraft FZ1, FZ2, FZ3, FZ4, FZ5 intended to operate flight route 10 must meet. These technical requirements include, for example, the required range and the number of seats. At the same time, suitable information, such as range and number of seats, is available for each aircraft FZ1, FZ2, FZ3, FZ4, FZ5, which can be used to determine whether an aircraft FZ1, FZ2, FZ3, FZ4, FZ5 can actually operate a specific flight route 10.
[0053] The method according to the invention is based on Figure 1 based on the Figure 2 as well as 3a and b explained.
[0054] As a first step, all necessary maintenance work 20 for all aircraft FZ1, FZ2, FZ3, FZ4, FZ5 is determined, at least for the first period T1. At the same time, the necessary maintenance work 20 for the second period T2 can also be determined, although this information is only regularly accessed when the routing for the second period T2 is created, which is done later based on the Figure 3a and b This will be explained. It is therefore also possible that the necessary maintenance work 20 for the second period T2 will only be determined when the routing for this period T2 is created or has already been created.
[0055] If the required maintenance work 20 determined for the first period T1 does not differ from the maintenance work 20 already planned for this period T1, the routing created for the first period T1 can be adjusted accordingly. Figure 1remain unchanged.
[0056] However, it is possible that during operation of an aircraft FZ1, FZ2, FZ3, FZ4, FZ5, an error message may occur on an on-board computer of one of the aircraft FZ1, FZ2, FZ3, FZ4, FZ5 during the first period T1, requiring short-term maintenance.
[0057] In Figure 2 For the aircraft FZ4, this includes a short-term maintenance task 22 required due to an error message, encompassing its end date 23, by which the maintenance must be completed. The zigzag line clarifies that maintenance task 22 is not a planned maintenance task 20 defined by maintenance intervals.
[0058] Since the deadline 23 for this short-notice maintenance work 22 lies within the first period T1, a suitable ground time for the affected aircraft FZ4 is sought, during which the aircraft FZ4 is available at a maintenance station adequately equipped for the required maintenance work 22 along the existing routing of aircraft FZ4 – in this case, maintenance station W2.2. The execution of maintenance work 22 is then scheduled accordingly in the routing of aircraft FZ4, as shown in Figure 2 shown.
[0059] When determining the required maintenance work 20 for all aircraft FZ1, FZ2, FZ3, FZ4, FZ5, maintenance work 20 whose end dates 21 lie in the second period T2 is also determined - at the latest before the routing for the second period T2 is determined.
[0060] For maintenance work 20, with completion date 21 in the second period T2, the required time periods within the second period T2 are defined, for which ground time for the affected aircraft FZ1, FZ2, FZ3, FZ4, FZ5 must be allocated at maintenance stations WS1.1, WS2.1, WS2.2, which are adequately equipped for the required maintenance work 20. In the Figure 2 The maintenance work 20 shown, with a completion date of 21, takes place in the second period T2, with the time spans corresponding to the respective maintenance work 20. As will be explained later in connection with Figure 3bTo explain in more detail, it is also possible to schedule several maintenance tasks (20) within a single time period. If information is available regarding which maintenance tasks (20) can be performed in parallel if necessary, these tasks can be scheduled concurrently within the same time period. It is also possible to schedule maintenance tasks (20) whose preparatory and follow-up work—for example, the disassembly and assembly of individual components—is identical or similar, together in order to leverage synergies.
[0061] Once the relevant time periods have been determined, the routing of all aircraft FZ1, FZ2, FZ3, FZ4, FZ5 in the flight network for the second period is then determined, so that on the one hand all flight routes 10 are served, and on the other hand the aircraft FZ1, FZ2, FZ3, FZ4, FZ5 are scheduled at maintenance stations WS1.1, WS2.1, WS2.2 for the previously determined time periods required to carry out the maintenance work 20.
[0062] When determining the routing, the technical data of the aircraft FZ1, FZ2, FZ3, FZ4, FZ5 are compared with the technical requirements of the individual flight routes 10 in such a way as to ensure that an aircraft FZ1, FZ2, FZ3, FZ4, FZ5 intended for a flight route 10 is technically capable - e.g. with regard to passenger capacity and range - of actually operating the flight route 10.
[0063] When scheduling the time periods for the maintenance work 20, information on the maintenance work 20 and on the technical equipment of the individual maintenance stations WS1.1, WS2.1, WS2.2 is used to ensure that the maintenance work 20 to be carried out within a time period can actually be carried out at the designated maintenance station WS1.1, WS2.1, WS2.2.
[0064] In Figure 3aThe routing of aircraft FZ1, FZ2, FZ3, FZ4, FZ5 is shown, based on the maintenance work 20 with a completion date in the second period 21 and the flight routes 10 to be served in the second period, in which sufficient ground time is provided for all necessary maintenance work 20 at maintenance stations WS1.1, WS2.1, WS2.2 equipped for this purpose.
[0065] In the example routing shown, the following results: Figure 3aThe special feature is that the maintenance required for aircraft FZ1 (20) can only be carried out at maintenance station WS1.1. Since the other constraints in the routing for aircraft FZ1 do not result in sufficient ground time at airport FZ1, a ferry flight from airport FZ2 to airport FZ1 is required before the actual maintenance (20) at maintenance station WS1.1. As this flight does not constitute a scheduled flight route (10), it can be operated as an empty flight or offered as an additional special flight.
[0066] Figure 3b is basically with Figure 3a comparable. However, in Figure 3b Additional maintenance work 22 due to error messages from the on-board computers of aircraft FZ1 and FZ5 must also be taken into account.
[0067] Even though the completion date 23 of the maintenance 22 required for aircraft FZ1 falls within the second period T2, maintenance 22 can be performed in the first period T1 together with the maintenance already scheduled at maintenance station WS1.1. Based on the information regarding the maintenance tasks 20 and 22 to be performed, as well as the technical equipment of maintenance station WS1.1, maintenance 22 can be scheduled together with maintenance 20 without exceeding the ground time previously used for aircraft FZ1 to perform maintenance work 20.
[0068] Similarly, one of the maintenance tasks required for the aircraft FZ5 is scheduled together with a ground time at maintenance station WS2.1 that was already planned for the first period T1 but extends into the second period T2.
[0069] Since this ground time is insufficient to perform the second of the maintenance tasks 22 required for aircraft FZ5, an additional visit to maintenance station WS2.2 is scheduled for aircraft FZ5. This is because aircraft FZ5 is included in the routing as it would be without the additional maintenance tasks 22 (see...). Figure 3a Since the aircraft does not have sufficient ground time to perform the maintenance in question (22), a different routing is established for the second period T2, in which sufficient ground time is provided at an airport FH1, FH2, FH3, FH4, FH5 with a sufficiently equipped maintenance station WS1.1, WS2.1, WS2.2. This differs from the routing from Figure 3aIn the routing shown in Figure 3b, some flight routes of aircraft FZ1 and FZ5 are "swapped". This routing also takes into account the technical requirements of the individual flight paths 10 and the technical characteristics of aircraft FZ1, FZ2, FZ3, FZ4, and FZ5.
[0070] At the maintenance stations WS1.1, WS2.1, WS2.2, the maintenance operations 20, 22 determined by the method according to the invention are carried out at the times provided for this purpose.
Claims
1. Method for carrying out items of maintenance work (20, 22) on commercial aircraft (FZ1, FZ2, FZ3, FZ4, FZ5) of a fleet used in a flight network, wherein - for each aircraft (FZ1, FZ2, FZ3, FZ4, FZ5) of the fleet: - technical data, - items of information on required items of maintenance work (20, 22) on the basis of maintenance intervals and / or error messages comprising deadlines (21, 23) for the completion of the individual items of maintenance work (20, 22), and - items of information on the provided routing of the aircraft (FZ1, FZ2, FZ3, FZ4, FZ5) in the flight network in a first period of time (T1) comprising the ground times of the aircraft (FZ1, FZ2, FZ3, FZ4, FZ5); - for the fleet: - a flight plan for a second period of time (T2) following the first period of time (T1), comprising the flight routes (10) of the flight network to be operated having the technical requirements of the individual flight routes, wherein, for the second period of time (T2), it is not yet specified which aircraft (FZ1, FZ2, FZ3, FZ4, FZ5) is actually to operate the individual flight routes (10) in each case; - for the flight network: - the maintenance stations (WS1.1, WS2.1, WS2.2) in the flight network comprising their technical equipment and capacity; are available, having the following steps: - determining the required items of maintenance work (20, 22) of at least one aircraft (FZ1, FZ2, FZ3, FZ4, FZ5) comprising the deadlines (21, 23) of the items of maintenance work (20, 22); - if the deadline (21, 23) of at least one item of maintenance work (20, 22) of an aircraft (FZ1, FZ2, FZ3, FZ4, FZ5) falls in the first period of time: - specifying a maintenance station (WS1.1, WS2.1, WS2.2) adequately equipped for carrying out the item of maintenance work (20, 22) in the flight network for carrying out the item of maintenance work (20, 22) in a specific ground time of the aircraft (FZ1, FZ2, FZ3, FZ4, FZ5); - if the deadline (21, 23) of an item of maintenance work (20, 22) of an aircraft (FZ1, FZ2, FZ3, FZ4, FZ5) falls in the second period of time (T2): - specifying at least one time span required for carrying out the item(s) of maintenance work (20, 22) on an aircraft (FZ1, FZ2, FZ3, FZ4, FZ5) within the second period of time (T2), and - specifying the routing of all aircraft (FZ1, FZ2, FZ3, FZ4, FZ5) in the flight network in consideration of the technical data of the aircraft (FZ1, FZ2, FZ3, FZ4, FZ5) and the technical requirements of the individual flight routes (10), wherein the routing for the aircraft (FZ1, FZ2, FZ3, FZ4, FZ5) to be maintained has a ground time corresponding to the at least one specified time span at a maintenance station (WS1.1, WS2.1, WS2.2) adequately equipped for carrying out the item of maintenance work (20, 22); and - carrying out the items of maintenance work (20, 22) on an aircraft (FZ1, FZ2, FZ3, FZ4, FZ5) at the specified maintenance station (WS1.1, WS2.1, WS2.2) in the provided ground time.
2. Method according to Claim 1, wherein, if the deadline (21, 23) of an item of maintenance work (20, 22) of an aircraft (FZ1, FZ2, FZ3, FZ4, FZ5) falls in the second period of time (T2), it is checked whether, as the flight plan progresses out of the first period of time (T1), it is possible to carry out the item of maintenance work (20, 22) at an adequately equipped maintenance station (WS1.1, WS2.1, WS2.2) at a planned ground time and, if so, the routing of all aircraft (FZ1, FZ2, FZ3, FZ4, FZ5) in the flight network is updated for the second period of time (T2) until the deadline (23, 21) of the item of maintenance work (20, 22) from the first period of time (T1) so that the otherwise required computing power for creating an alternative routing is omitted.
3. Method according to one of the preceding claims, wherein the items of information on required items of maintenance work (20, 22) comprise specifications on which items of maintenance work (20, 22) may technically be executed in parallel.
4. Method according to one of the preceding claims, wherein the specification of a maintenance station (WS1.1, WS2.1, WS2.2) adequately equipped for carrying out the item of maintenance work (20, 22) in the first period of time (T1) selects that maintenance station, the capacities of which are sufficient for the items of maintenance work (20, 22) in question.
5. Method according to one of the preceding claims, wherein if there is not sufficient capacity of a maintenance station (WS1.1, WS2.1, WS2.2) within the first period of time (T1) for specifying carrying out an item of maintenance work (20, 22) on an aircraft (FZ1, FZ2, FZ3, FZ4, FZ5), a deferrable item of maintenance work (20, 22) on another aircraft (FZ1, FZ2, FZ3, FZ4, FZ5) at the maintenance station (WS1.1, WS2.1, WS2.2) is deferred to provide capacities for the items of maintenance work (20, 22) of the one aircraft (FZ1, FZ2, FZ3, FZ4, FZ5) that are urgently necessary at short notice.
6. Method according to one of the preceding claims, wherein when specifying carrying out items of maintenance work (20, 22) in the first period of time (T1), carrying out at least one item of maintenance work (20, 22), the deadline (21, 23) of which is in the second period of time (T2), is also specified.
7. Method according to one of the preceding claims, wherein the technical data of an aircraft (FZ1, FZ2, FZ3, FZ4, FZ5) comprise specifications of the aircraft type, the jet engine options, the payload mass, and / or the passenger capacity, preferably divided into individual booking classes, the range, the cruise speed, and / or take-off and landing requirements.
8. Method according to one of the preceding claims, wherein for the required items of maintenance work (20, 22), items of information on the components of the aircraft (FZ1, FZ2, FZ3, FZ4, FZ5) affected by the items of maintenance work and / or requirements on which aircraft systems are to be temporarily shut down for the items of maintenance work (20, 22) are available.
9. Method according to one of the preceding claims, wherein the technical requirements of the individual flight routes (10) comprise take-off and landing parameters of the connected airports and / or the distance between the airports, wherein the take-off and landing parameters preferably comprise the length and / or the permissible surface pressure per landing gear wheel of the take-off and / or landing runways.
10. Method according to one of the preceding claims, wherein the first period of time (T1) is up to 21 days, preferably 3 to 7 days.
11. Computer program product comprising program parts which, when loaded in a computer, are designed for carrying out the method according to one of the preceding claims.
