COMPUTER-IMPLEMENTED METHOD FOR COMPENSATING FOR A SMART METER MEASUREMENT FAILURE
Patent Information
- Application Number
- DE502023005392
- Authority / Receiving Office
- DE · DE
- Patent Type
- Patents
- Current Assignee / Owner
- Filing Date
- 2023-09-27
- Publication Date
- 2026-11-19
- Estimated Expiration
- 2043-09-27
AI Technical Summary
Existing smart meters in low-voltage networks experience measurement failures due to disrupted data transmission near high electromagnetic fields, leading to unreliable access of continuous time series of measurement data, which hinders intelligent grid control and monitoring.
A computer-implemented method using autoencoders to translate time series data from functioning smart meters to simulate data for failed meters, leveraging impedance fluctuations and interdependencies among smart meters based on physical-electrotechnical principles, with local or cloud-based processing to ensure seamless data availability.
Ensures uninterrupted and reliable time series of measurement data, enabling effective network operation and control even under unstable transmission conditions, improving data accuracy and reducing computational and storage costs.
Description
AREA OF INVENTION
[0001] The invention relates to a computer-implemented method for compensating for a measurement failure of a smart meter in a low-voltage network, wherein time series of numerical measurement data are collected via a system comprising The invention comprises a low-voltage network, at least a first smart meter which provides a time series of numerical measurement data from the first smart meter, a second smart meter which provides a time series of numerical measurement data from the second smart meter, as well as a processor and a memory. The invention also includes a corresponding computer program product and a corresponding computer-implemented device.
[0002] A measurement failure, in this context, means that the smart meter either does not provide any measurement data or the measurement data is not properly transmitted to the processor. STATE OF THE ART
[0003] The starting point is the different load profile of the electricity grid in rural areas, where, for example, feed-ins from private photovoltaic systems can lead to voltage problems, and in urban areas, where a risk of overloading equipment due to high population density and thus a high number of consumers in a small space can lead to problems regarding current strength.
[0004] To address this problem, one option is to accelerate the expansion of the electricity grid, but this is costly and time-consuming. Alternatively, solutions can be sought to better utilize the existing infrastructure. For this, intelligent control within the electricity grid, also known as a smart grid, using technologies such as storage and regulation, is absolutely essential.
[0005] The basis for such intelligent control is comprehensive and, ideally, detailed measurement data about the low-voltage network to be controlled. Smart meters, a well-established technology, are suitable measuring instruments for this purpose. The use of these devices, primarily installed for simple, cost-effective, and customer-friendly billing of energy consumption, is constantly increasing. To function correctly, these devices collect a multitude of measurements at each point in the low-voltage network, which must then be transmitted to the energy supplier(s) for billing purposes. Therefore, these devices also include remote communication capabilities and can, in principle, be used as measuring sensors with a communication interface.
[0006] However, as a rule, no dedicated communication technologies are available for forwarding the data collected by the smart meters, so established mobile communication standards such as GPRS must also be used.
[0007] Especially near high electromagnetic fields, such as in distribution boxes or meter boxes where smart meters are typically located, data connections are often disrupted or fail completely, meaning that the inherently available measurement data is not consistently accessible remotely. This is precisely what is needed for intelligent control of the power grid.
[0008] The German patent application DE 10 2017 211737 A1 discloses a monitoring device for evaluating sensor data, in which, in the event of a sensor failure, virtual sensor data are created based on remaining functional sensors by means of a two-stage selection process, whereby sensor candidates are first identified on the basis of a knowledge-based approach and then mathematical relationships between the sensor data are calculated.
[0009] The publication DE 196 81 530 B4 describes a method for detecting and identifying faulty sensors in a process in which principal component analysis is used to generate sensor estimation signals and a sensor validity index is determined as a function of residuals that denote the difference between estimation and output signals.
[0010] The publication EP 2 400 310 A2 discloses a method and system for determining the health of a measuring system, in which fault conditions of different severity levels are detected and weighted in order to determine a single value for the health of the energy measuring device.
[0011] Document WO 2021 / 194338 A1 describes a method for providing communication with a distributed multitude of electronic utility meters, in which intermediate devices are provided at the respective meters to forward encrypted messages between the meters and a central processor without changing the encrypted state of the messages.
[0012] The limitations of the state of the art therefore lie particularly in the fact that continuous, uninterrupted time series of measurement data on physical-electrical quantities in low-voltage networks with smart meters are in principle available, but cannot be reliably and permanently accessed due to the aforementioned problems in mobile communication. TASK OF INVENTION
[0013] The object of the invention is therefore to overcome the described limitations of the prior art by describing a method for ensuring seamlessly available time series of physical-electrotechnical measured variables based on the measurement data that are fundamentally available from smart meters. This should enable the network operator to reliably fulfill its control and monitoring tasks even under unstable data transmission conditions, and thus allow the low-voltage network to be operated closer to its absolute capacity limit.
[0014] The aim is to utilize information that is generally available in the low-voltage network, such as the impedance fluctuations within network sections that connect individual smart meters in the low-voltage network, which are based on general physical and electrotechnical principles. PRESENTATION OF THE INVENTION
[0015] To solve the problem of the invention, a computer-implemented method for compensating a measurement failure of a smart meter in a low-voltage network is presented, wherein time series of numerical measurement data over a system comprising the low-voltage network, at least a first smart meter, which provides a time series of numerical measurement data from the first smart meter, a second smart meter, which provides a time series of numerical measurement data from the second smart meter, as well as a processor and a memory, are created, characterized in that the processor includes an autoencoder which is trained to translate time series of the first smart meter into time series of the second smart meter, that the first smart meter and the second smart meter take measurements of physical quantities relating to the low-voltage network at defined time intervals and thus create the time series of numerical measurement data of the first smart meter and the time series of numerical measurement data of the second smart meter, and wherein, in the case that the second smart meter operates without errors, the time series of numerical measurement data of the first smart meter and the time series of numerical measurement data of the second smart meter are transferred via aIn particular, the data is transferred wirelessly to the storage device, and in the event that the second smart meter has failed and does not provide a time series of numerical measurement data from the second smart meter, the time series of numerical measurement data from the first smart meter is transferred to the storage device via a data transmission link, in particular a wireless one, and the time series of numerical measurement data from the second smart meter in the storage device is replaced by the autoencoder, based on the time series of numerical measurement data from the first smart meter, by a virtual time series of numerical measurement data from the second smart meter.
[0016] An autonomous autoencoder is an artificial neural network used to learn efficient encoding. The autoencoder provides a machine translation from an input signal to an output signal. During training, an input signal is mapped to a compressed representation, and this representation is then mapped back to an output signal in a second step.
[0017] The method according to the invention thus implements a machine translation of a time series from one smart meter used as a sensor into a time series from another such sensor in the same time interval. The method according to the invention represents a machine translation of time series of measurement data from smart meters into time series of measurement data from other smart meters located in the low-voltage network. The input of the autoencoder is the data from a specific smart meter in a predetermined, fixed time interval, and the output is the data from another smart meter in the same time interval.
[0018] The low-voltage network typically comprises a large number of smart meters, and the method according to the invention is, in principle, applicable to each pair of smart meters and is generally used in this way. The autoencoder will therefore link a large number of, in particular each, smart meter of the low-voltage network with a large number of other, in particular all, smart meters of the low-voltage network.
[0019] In a particular embodiment of the method according to the invention, the processor is an edge device integrated into the low-voltage network.
[0020] This embodiment offers the additional advantage that the method according to the invention can be carried out locally in the low-voltage network or close to the consumer, thus keeping the required data transmission distances short and making them less susceptible to interference.
[0021] In another embodiment of the method according to the invention, the processor is a cloud-based central computing unit located outside the low-voltage network.
[0022] In this way, the required computing power for the method according to the invention can be concentrated on a single central computing unit, which allows for more efficient use of existing computing power capacities.
[0023] In a particular embodiment of the method according to the invention, the storage device is a local storage device integrated into the low-voltage network.
[0024] In this way, data transmission distances can be saved and the process, especially considering the embodiment using an edge device, can be carried out efficiently locally in the low-voltage network or at the consumer's premises, independent of central data centers.
[0025] In a particular embodiment of the method according to the invention, the storage device is a cloud-based central storage device located outside the low-voltage network.
[0026] The advantage of this design is the potential for savings in storage media, since a large central storage unit operates more efficiently and cost-effectively than numerous smaller storage media. In particular, if the processor is a cloud-based central processing unit, it can quickly access the cloud-based central storage, allowing the autoencoder integrated into the processor to perform its tasks independently of data transmission problems from the low-voltage network.
[0027] In the method according to the invention, it is provided that the time series of numerical measurement data from the first smart meter and, optionally, the time series of numerical measurement data from the second smart meter are transmitted via a further, in particular wireless, data transmission link to a computing unit comprising a history memory and an AI unit and stored there, and that the AI unit is connected to the history memory in a data-conducting manner and recalculates the virtual time series of numerical measurement data from the second smart meter from the multitude of time series of numerical measurement data stored therein, such that the absolute difference, in the sense of a sum of the differences of all entries of the respective time series,the time series of numerical measurement data from the second smart meter and the newly calculated virtual time series of numerical measurement data from the second smart meter are below a specified translation error, and that the new virtual time series of numerical measurement data from the second smart meter calculated in this way is transferred to the memory via the further data transmission path and stored there, and is used for further training of the autoencoder, thus updating the processor's autoencoder.
[0028] This embodiment represents a real-time update of the simulated measurement data in the sense of "nowcasting." The algorithm for calculating the virtual numerical measurement data of the second smart meter can be not only finite Boltzmann statistics with subsequent reverse time evolution, but also nonlinear artificial intelligence methods such as gradient descent. The aforementioned translation error, as a measure of the quality of the calculated / simulated measurement data, can be implemented as the integration of the difference between the calculated and the last available measured data time series in the relevant time interval. Training the autoencoder thus corresponds to an improvement of the autoencoder itself, in the sense of upgrading the underlying program or algorithm to an improved version resulting from the training.
[0029] In other words, the autoencoder is continuously trained by the AI unit connected to the history memory. This AI unit can, for example, be part of the network operator's SCADA (Supervisory Control and Data Acquisition) system.
[0030] In a particularly preferred embodiment of the method according to the invention, the time series of numerical measurement data from at least one further smart meter, which is transmitted to the computing unit via the further wireless data transmission link, is also used to recalculate the virtual time series of numerical measurement data from the second smart meter.
[0031] This provides the AI unit with additional information about the low-voltage network in which the second smart meter is installed. By using data from additional smart meters, an even more accurate prediction of the measurement data that the second smart meter will deliver in a given time interval can be made, and this prediction can also be made faster compared to the situation where only the first smart meter is available as a data source. The advantage of this implementation is therefore the accuracy in terms of a lower translation error and the faster availability of the virtual measurement data. n smart meters result in 2n paired configurations for mutually replacing measurement data. Permutations are included because the configuration "A replaces the data of B" is not the same as "B replaces the data of A".
[0032] In a further embodiment of the method according to the invention, if the second smart meter has not failed and provides a time series of numerical measurement data from the second smart meter, this is hidden by the AI unit and the virtual time series of numerical measurement data from the second smart meter is nevertheless recalculated.
[0033] With this embodiment of the method according to the invention, the artificial intelligence of the AI unit can also be trained in parallel with normal operation, in which all smart meters installed in the low-voltage network are properly supplying measurement data. By hiding the data sets of one or more smart meters, a failure of that meter is simulated, while the actually measured data remains available for comparison purposes, such as calculating the translation error. In a particularly simple embodiment, such a method can be based on the leave-one-out method (cross-validation).
[0034] In another embodiment of the invention, instead of the time series of numerical measurement data of the second smart meter, the time series of numerical measurement data of the first smart meter or the time series of numerical measurement data of at least one further smart meter is hidden, and the virtual time series of numerical measurement data of the second smart meter is recalculated on the basis of this data.
[0035] In a particular embodiment of the invention, the AI unit displays the transmission error depending on the smart meter whose measurement data was hidden, stores it in the history memory, and determines the smart meter whose hiding causes the smallest translation error.
[0036] This embodiment allows for the identification of particularly reliable combinations of smart meters, i.e., those with small translation errors, which are then preferentially used for calculating virtual measurement data. Conversely, particularly unreliable combinations of smart meters, i.e., those with large translation errors, can be excluded and subsequently no longer considered by the AI unit, thus saving computing time by pre-eliminating many unprofitable combinations of smart meters.
[0037] In a particular embodiment of the invention, the virtual time series of numerical measurement data from the second smart meter, which have been obtained from numerical measurement data from different smart meters, are averaged point by point.
[0038] This approach further increases the reliability of the predictions made by the virtual data set regarding the measurement data of a given smart meter.
[0039] In a particular embodiment of the invention, the memory is a virtual memory that forms part of the history memory, and the autoencoder is a virtual machine that forms part of the AI unit.
[0040] This approach allows for further hardware savings, making the implementation of the inventive method simpler and more cost-effective. This embodiment corresponds to a cloud solution for the inventive method. Furthermore, this embodiment also offers the possibility of training the artificial intelligence of the AI unit even faster or reducing the translation error even further, since, for example, data from another low-voltage network, even one located at a great distance, can easily be used in this way, allowing several low-voltage networks to be combined into a single large virtual network. In other words, the inventive method can also be applied across many network areas. This means that the autoencoders are also used when a low-voltage network exhibits specific behavior (determined by loads, generators, etc.).) if a measurement fails at a critical point, a virtual measurement point is created by referencing measurement values or smart meters in similar networks via the autoencoder.
[0041] Also included in the invention is a computer program product as defined in independent claim 12.
[0042] The invention also includes a computer-implemented device as defined in independent claim 13. BRIEF DESCRIPTION OF THE FIGURES
[0043] The invention is explained in more detail below using exemplary embodiments. The figures are exemplary in nature, intended to illustrate the inventive concept, and are not to be understood as limiting or even as an exhaustive representation of the invention.
[0044] This shows: Fig. 1 a schematic sketch of the system for carrying out the method according to the invention. WAYS TO IMPLEMENT THE INVENTION
[0045] Fig. 1 Figure 1 shows a schematic sketch of the system for carrying out the method according to the invention in the case that the second smart meter 2b has failed and does not provide a time series of numerical measurement data from the second smart meter 2b1.
[0046] In a first step of the procedure, the smart meters 2a-2d, which are installed at different measuring points in a low-voltage network 9, in particular the first smart meter 2a and the second smart meter 2b, send their numerical measurement data to the local memory 4 in the edge device 5. The measurement data set of the second smart meter 2b is empty in the case shown, as mentioned above.
[0047] In a next step, the autoencoder 3 recognizes this fact and therefore replaces the empty time series of numerical measurement data from the second smart meter 2b1 in local memory 4 with a virtual time series of numerical measurement data from the second smart meter 2a1, which the trained autoencoder 3 calculates on the basis of the measured time series of numerical measurement data from the first smart meter.
[0048] In a parallel process, the virtual numerical measurement data of the second smart meter 2a1, stored in local memory 4, are continuously updated.
[0049] The computing unit 6, comprising a history memory 7 and an AI unit 8, has access to the processor 5, which is implemented here as an edge device in the low-voltage network 9, and its autoencoder 3. The AI unit 8 stores all virtual time series of numerical measurement data calculated by the autoencoder 3, as well as the measurement data received from the memory 4 of the processor 5—namely, the measured time series of numerical measurement data from the various smart meters 2a–2d—in a main memory 7 and calculates new virtual numerical measurement data for the second smart meter 2a1 from this time-dependent data. This is possible because all smart meters 2a–2d in the low-voltage network 9 are interconnected, and therefore, due to general physical / electrotechnical laws, the physical quantities measured by the individual smart meters at different points in the low-voltage network 9 are interdependent with respect to this network.These regularities are not linear due to the complex branching of individual electrical lines in the low-voltage network 9, but are nevertheless deterministic and can be determined by the AI unit 8 using artificial intelligence methods, such as gradient descent.
[0050] In this way, the autoencoders 3 are trained by the AI unit 8 of the computing unit 6. The performance of the autoencoders 3 can be continuously monitored by the AI unit 8 (provided no nodes, i.e., smart meters 2a-2d, fail). Simultaneously, if a significant improvement in an autoencoder 3 results from the calculations of the AI unit 8, the model of the autoencoder 3 can be updated on the autoencoder 3 trained as an edge device.
[0051] Based on these regularities discovered by the AI unit 8 and the correspondingly trained autoencoders 3, the missing measurement data of the second smart meter 2b – in the embodiment of the invention presented here – are predicted and stored as a newly calculated virtual time series of numerical measurement data of the second smart meter 2a1 in the local memory 4. This ensures that the time series of measurement data of a smart meter 2a-2d – in the presented embodiment of the second smart meter 2b – is always complete, particularly even if the second smart meter 2b has failed or transmission of the numerical measurement data of the second smart meter 2b is not possible for other reasons.
[0052] Regardless of the grammatical gender of a particular term, persons with male, female or other gender identities are included. REFERENCE MARK LIST
[0053] 1 System 2a First smart meter 2a1 Virtual time series of numerical measurement data from the second smart meter 2b Second smart meter 2b1 Time series of numerical measurement data from the second smart meter 2c, 2d Further smart meters 3 Autoencoder 4 Memory 5 Processor 6 Computing unit 7 History memory 8 AI unit 9 Low-voltage network
Claims
1. Computer-implemented method for compensating for a measurement failure of a smart meter (2a-2d) in a low voltage network (9), wherein time series of numerical measurement data are generated via a system (1), comprising - the low voltage network (9), - at least one first smart meter (2a), which provides a time series of numerical measurement data of the first smart meter, - a second smart meter (2b), which provides a time series of numerical measurement data of the second smart meter (2b1), - and a processor (5) and a memory (4), wherein the processor (5) comprises an autoencoder (3) which is trained to translate time series of the first smart meter (2a) to time series of the second smart meter (2b), the first smart meter (2a) and the second smart meter (2b) take measurements of physical variables relating to the low voltage network (9) at defined intervals and in this way the time series of numerical measurement data of the first smart meter and the time series of numerical measurement data of the second smart meter (2b1) is generated and wherein - in the event that the second smart meter (2b) operates correctly, the time series of numerical measurement data of the first smart meter and the time series of numerical measurement data of the second smart meter (2b1) is transferred to the memory (4) via an in particular wireless data transmission link and - in the event that the second smart meter (2b) has failed and does not provide time series of numerical measurement data of the second smart meter (2b1), the time series of numerical measurement data of the first smart meter is transferred to the memory (4) via an in particular wireless data transmission link and the time series of numerical measurement data of the second smart meter (2b1) in the memory (4) of the autoencoder (3) is replaced on the basis of the time series of numerical measurement data of the first smart meter by a virtual time series of numerical measurement data of the second smart meter (2a1), characterised in that - the time series of numerical measurement data of the first smart meter and, if applicable, the time series of numerical measurement data of the second smart meter (2b1) is transferred via an additional, in particular wireless, data transmission link to a computing unit (6), where it is stored, which computing unit comprises a historical data store (7) and an AI unit (8), and that the AI unit (8) is in data communication with the historical data store (7) and the virtual time series of numerical measurement data of the second smart meter (2b1) is recalculated from the plurality of time series of numerical measurement data of the first and of the second smart meter stored there such that the absolute difference, within the meaning of a total of the differences of all entries of the respective time series, of the time series of numerical measurement data of the second smart meter (2b1) and the recalculated virtual time series of numerical measurement data of the second smart meter (2a1), lies below a predefined translation error and that the new virtual time series of numerical measurement data of the second smart meter (2b1) calculated in this manner is transferred via the additional data transmission link to the memory (4) and is stored there and is used for further training of the autoencoder (3) and the autoencoder (3) of the processor (5) is thereby updated.
2. Computer-implemented method according to claim 1, characterised in that the processor (5) is an edge device (5) integrated in the low voltage network (9).
3. Computer-implemented method according to claim 1, characterised in that the processor (5) is a cloud-based central computing unit located outside the low voltage network (9).
4. Computer-implemented method according to claim 1, 2 or 3 characterised in that the memory (4) is a local store integrated in the low voltage network (9).
5. Computer-implemented method according to claim 1, 2 or 3 characterised in that the memory (4) is a cloud-based central store located outside the low voltage network (9).
6. Computer-implemented method according to one of the preceding claims, characterised in that, for recalculation of the virtual time series of numerical measurement data of the second smart meter (2b1), the time series of numerical measurement data of at least one additional smart meter (2c, 2d) which is transferred via the additional, in particular wireless, data transmission link to the computing unit, is likewise used.
7. Computer-implemented method according to one of the preceding claims, characterised in that, in the event that the second smart meter has not failed and provides a time series of numerical measurement data of the second smart meter (2b1), this is hidden by the AI unit (8) and the virtual time series of numerical measurement data of the second smart meter (2a1) is nevertheless recalculated.
8. Computer-implemented method according to claim 7, characterised in that the time series of numerical measurement data of the first smart meter (2a1) or the time series of numerical measurement data of the at least one additional smart meter (2c, 2d) is hidden instead of the time series of numerical measurement data of the second smart meter (2b) and the virtual time series of numerical measurement data of the second smart meter (2a1) is recalculated on the basis of this data.
9. Computer-implemented method according to one of claims 7 or 8, characterised in that the translation error is displayed and stored in the historical data store (7) by way of the AI unit (8) dependant upon the smart meter whose measurement data was hidden, and that smart meter, the hiding of which causes the fewest translation errors, is determined therefrom.
10. Computer-implemented method according to one of claims 1 to 9, characterised in that the virtual time series of numerical measurement data of the second smart meter (2b1), which has been obtained by numerical measurement data of different smart meters (2a, 2c, 2d), is averaged on a pointby-point basis.
11. Computer-implemented method according to one of claims 1 to 10, characterised in that the memory (4), as a virtual memory, is part of the historical data store (7) and the autoencoder (3), as a virtual machine, is part of the AI unit (8).
12. Computer program product comprising instructions for instructing a system (1) comprising the low voltage network (9), at least one first smart meter (2a) which provides a time series of numerical measurement data of the first smart meter, at least one second smart meter (2b), which provides a time series of numerical measurement data of the second smart meter (2b1), a processor (5), an autoencoder (3), a memory (4), the computing unit (6), comprising the main memory (7) and the AI unit (8), and, if applicable, at least one additional smart meter (2c, 2d) to carry out all method steps according to one of claims 1 to 11.
13. Computer-implemented apparatus comprising at least the low voltage network (9), the first smart meter (2a), the second smart meter (2b), the processor (5), the autoencoder (3) and the memory (4), further comprising the main memory (7) and the AI unit (8), and, if applicable, at least one additional smart meter (2c-2d), which apparatus is configured to carry out a method according to one of claims 1 to 11.